Tag: construction

Chicago and Illinois construction updates, October 2010 edition

This post will be updated as I receive more information and shoot more photos. Please contribute your own updates and news.

  • High-speed rail in Illinois – Yes, America is building some “high-speed” rail (for the second time). The first leg of track replacement is from Springfield to Alton (across the Mississippi River from St. Louis). I am really interested in renting a car and driving down here to see it for myself.
  • 31st Street harbor/marina – Originally introduced on my blog in July and again in August. The Chicago Park District is developing a full marina, including a boat ramp and restaurant.
  • Sustainable streetscape in Pilsen – A water feature and bioswale was recently installed at Benito Juarez Community Academy on Cermak Road. I’ve been told it’s especially fantastic during the rain, as the water is collected from the roof, pours down a spout into a small creek.
  • 35th Street Metra station – Originally introduced on my blog in July. The line will help my roommate get to his old neighborhood faster. Oh, it will improve access to the White Sox stadium, hopefully helping to reduce idling and congestion on the Dan Ryan expressway and our neighborhood roads that get backed up during baseball games.

31st Street Beach and harbor construction.

Do you have construction updates for your city or state?

High-speed rail under construction in Illinois

UPDATE: The City of Carlinville Facebook page provides consistent and timely updates on the railroad crossing closures while the Union Pacific track is upgraded. The City posted photos, too.

If you weren’t specifically seeking out information on high-speed rail (HSR) construction, and you weren’t searching for “track renewal train” and other obscure keywords, you wouldn’t actually know about the status of HSR.

But that’s why you follow my blog – I’ll keep you updated.

Right now, crews are working 10 hour days, working 10 days on, and 5 days off* in Carlinville, Plainview (photo), and Alton, Illinois, to remove existing track and wooden ties and replacing them with concrete ties and continuously welded rail (CWR).

The proof is in the videos, taken only four days ago in Carlinville (map) on October 1, 2010. Watch more videos from PSQLead.

The Harsco Track Technologies Track Renewal Train 909 (TRT-909) does the following:

  • Picks up and carries out of the way old rail
  • Removes old wooden ties with a robot arm
  • Digs up ballast
  • Places new concrete ties
  • Drops in new rail and heats it so it can be “continuously welded”
  • Clamps new rail to new ties

What the beast looks like from afar. Photo of Union Pacific’s TRT-909 in Aldine, Texas, by Matthew Holman.

Thankfully Illinois doesn’t have a growing anti-rail political force like Ohio, California, Florida, or Wisconsin. All of these states have Republican candidates running for governor who say they will stop the train in its tracks. Read more about this unfortunate situation in The New York Times.

*This information comes from a secondary source. I hope to get in touch with someone who knows more about the work.

Proposed changes to 31st Street Harbor

Copied directly from the 31st Street Harbor Traffic Impact Analysis (PDF), prepared for the Chicago Public Building Commission by AECOM.

See Exhibit B on page 12 for a drawing and list of proposed changes. They’re exciting. When designing for the lakefront, the stakes are pretty high.

The only mention of “bike” or “bicycle” is misnaming the Lakefront Trail as the “Chicago Lakefront Bike Path.” Can’t anyone get this right? According to the LEED Strategy document, though, the project aims to get 1 point for a “bicycle storage/changing room.”

Stay on top of construction updates with this blog.

The 31st Street Harbor project is one of two new harbors being designed for the Chicago Park District along Chicago’s lakeshore. Located in the Bronzeville neighborhood on Chicago’s south side, the 31st Street Harbor will incorporate extensive new community amenities and a new 950 slip marina. These include over two new acres of green space located on a peninsula of land formed by a 1,200 foot long breakwater sheltering the new harbor, providing exceptional views of the Chicago skyline to the north. The breakwater will also create new underwater habitat and provide opportunities for fishing.

Photo shows the new breakwater and pier under construction. See Exhibit B.

The existing surface parking will be removed and relocated within a new parking structure covered by an accessible green roof that allows park users improved views of the lake while reducing impervious surface. Landscape plantings will include native plants selected to provide food and cover for the twice yearly bird migrations through the City, while also reducing maintenance and irrigation demands. A new fully accessible play area that connects the green roof area to the beach will replace an older existing playground, while improvements to pedestrian and vehicular circulation will improve connections to the neighborhoods in Bronzeville to the west. Located atop the green roof will be a new LEED Certified community center and restaurant, providing sorely needed facilities currently missing along the south lakeshore.

The marina itself will include approximately 950 new slips ranging from 35’ to 80’ in length, on site covered storage in the parking structure, fuel dock, marina store, dedicated shower facilities, and a public access boat ramp. Additionally, youth sailing programs and storage for small craft including kayaks will be provided, allowing this facility to make boating economically accessible to a very large portion of the community.

Breakwater and pier construction panorama at the beach in August 2010.

As part of these improvements, additional parking accommodations in addition to the new parking structure are being planned. Approximately 200 new parking spaces will be incorporated along the Fort Dearborn access road north of 31st Street, serving 31st Street beach. A new surface lot west of Lake Shore Drive and immediately south of 31st Street will be constructed with a capacity of over 150 spaces.

The existing attractions of Burnham Park near 31st Street will remain, including 31st Street Beach, the beach house, and the Burnham Skate Park.

Parking options:

  • 31st Street Harbor Parking Garage (310 covered spaces)
  • Surface Lot on Fort Dearborn north of 31st Street (202 spaces)
  • Surface Lot off Moe Drive south of 31st Street (161 spaces)
  • Total: 573 spaces

[Currently this beach has 188 auto parking spaces, a difference of 355% compared to the proposed quantity. It currently has about 14 bike parking spaces and needs more but I cannot find evidence that this number will increase when the new harbor opens.]

Update on the new Chicago harbor

Since I posted an article about new, non-auto infrastructure projects in Chicago, a lot of people looking for information on the 31st Street Harbor (now visibly underway) have come across my blog. For them, I give this update.

A new breakwater and new piers will be built. I really want to know what the floating eyeballs are for. I imagine they’re markers for construction.

I was counting people entering the Lakefront Trail from the 31st Street access point yesterday for an Active Transportation Alliance project. Afterwards, I moseyed over to get a glance at the construction.

This photo shows how the pier has been closed for construction. I hardly see anyone using the pier except just to walk down and back – it seems few people fish here.

Non-auto construction projects in Chicago

There are 17 construction projects listed here and none are about automobiles. Additionally, there is information about 2 studies for bus rapid transit-like projects.

Download all of these into Google Earth with this KML file.

A couple of these projects are being held up by the current Illinois roadway construction workers’ strike. UPDATE: Apparently a deal has been reached to end the strike.

Streetscapes

  • Blue Island/Cermak – I wrote about this project at length in October 2009. Construction should begin as soon as the strike is resolved. CONSTRUCTION UPDATE, 10-21-10: Bioswale, or creek, is mostly complete at Benito Juarez Community Academy (BJCA). Plaza with permeable pavers, and sheltered bike parking also complete. Photos here.
  • Congress Parkway – Full details and renderings from CDOT (PDF). Project should begin in 2010 and will narrow lanes, reduce number of lanes, straighten lanes (no more mid-intersection lane shifts), widen sidewalks, and improve crosswalks. Will add a lot of landscaping and unique and decorative lighting.
  • PROPOSED: Lawrence Avenue between Ashland and Western. Reduce the number of travel lanes from four to three, adding bike lanes and a center turn lane. Project limits include the rebuilt Ravenswood Metra station at 1800 W Lawrence. More details on Center Square Journal. Construction wouldn’t begin until 2011.

Transit

  • Morgan/Lake Green and Pink Line CTA station (new) – Details and renderings from CDOT (PDF) – Overview from Chicago Transit Authority – Tons of bike parking included at the beginning, how it should be. Construction should start this year. To better serve the West Loop area, where more people are moving to, but also has lots of existing businesses.
  • State/Grand Red Line CTA station renovation – Construction should finish this year.
  • 35th/Federal Rock Island Metra station (new) – Construction started in 2010.
  • LaSalle/Congress Intermodal Center – To improve connection between buses and the LaSalle Metra station. Mentioned in the Congress Parkway streetscape presentation (PDF).
  • Wilson Red Line CTA station renovation – Down the street from a new Target store that opens this weekend and hundreds of brand new housing units in the Wilson Yard development. Will use TIF funds from the Wilson Yard district. Overview on CTA Tattler.
  • Ravenswood Metra Station – A popular station on the Union Pacific-North line (to Kenosha). Will add longer and sheltered platform and become accessible. Details with Chicago Square Journal.
  • FLOATING: New Green Line CTA station at 18th or Cermak. Roosevelt station serves three lines. South Loop neighborhood fast growing. The new station would improve transit access to McCormick Place (at least if built at Cermak). Follow the Chicago Journal for more news on this topic.

morgan cta station rendering

Rendering from the Chicago Department of Transportation (CDOT) showing context-sensitive design. See the full presentation (PDF) for architectural influences.

Bridges

  • Halsted Street over North Branch Canal of the Chicago River. Replaces 99-year old moveable span with fixed span. No information on how it will accommodate the Halsted Street bike lane. Construction to begin in 2010 (PDF). CDOT project number 74062.
  • Navy Pier Flyover – Elevated section of the Lakefront Trail to bypass current bottleneck where the Lakefront Trail currently enters the Lake Shore Drive bridge over the Chicago River and DuSable park. Details from CDOT presentation on July 15, 2010.
  • PROPOSED: 35th Street pedestrian bridge over Metra/Illinois Central tracks and Lake Shore Drive to lakefront and Lakefront Trail. Bridge will be self-anchored suspension, like the new Bay Bridge from Oakland to San Francisco. Overview on Burnham Centennial (drawing says 2007).

Rendering of the Navy Pier Flyover as it travels over the Lakepoint Tower condominiums as seen at the Cities and Bicycles forum with David Byrne in June at the Chicago Cultural Center.

Other

  • Various CREATE projects. All CREATE projects involve railroads in some way and most projects will construct grade separations. I’ve written about CREATE.
  • The Chicago Park District opened a new beach at Oakwood/41st Street this year. The grand opening for the beach house happened this past Saturday.
  • The Chicago Park District is currently building a harbor and marina immediately south of the 31st Street beach. The Public Building Commission of Chicago has the details and renderings. AECOM, the architect of record, produced these concept drawings (PDF). It appears how bike riders currently navigate the intersection at the entrance to the beach will change to be a little more normal and not force bike riders on the sidewalk. It’s unclear how many new parking spaces are being created along the lakefront – the fewer the better. The concept plan shows a new parking lot on the west side of the railroad tracks, a design I wholly support.
  • FLOATING: Luann Hamilton mentioned at the Cities and Bicycles forum with David Byrne in June that CDOT was thinking about a buffered bike lane on Wells Street.

31st street harbor concept rendering

Rendering of the 31st Street harbor concept plan. As seen in the contractor’s presentation to the Public Building Commission of Chicago.

Related

Although not construction projects, two additional proposals merit your attention. The Chicago Department of Transportation and the Chicago Transit Authority each received grants this month to study and develop two corridors with bus rapid transit-like features. CDOT’s plan is to develop a priority bus lanes for up to seven routes between the Metra stations and Navy Pier and North Michigan Avenue (the Miracle Mile). Thank you to Kevin Z for the update.

CTA’s grant money is to fund the development of a speedy bus service from the southeast side to the West Loop via the north-south Jeffrey Avenue.