Tag: proposal

Friday is final day for comments about Damen-Elston-Fullerton

Tomorrow, Friday, May 13, 2011, is the final day to email comments to Bridget Stalla, project manager for the Damen-Elston-Fullerton reconfiguration.

What should you do?

  1. Read an overview of the project and my analysis
  2. View photos of the posters at April’s open house to understand what will and won’t change
  3. Think of what you like or don’t like about the project
  4. Email your comments to Bridget: bridget.stalla@cityofchicago.org
  5. Think about posting your comments here.

My draft comments

Here’s what I plan to email Bridget tomorrow:

  1. Bike lane on Damen – There should be a bike lane on Damen connecting the two ends north and south of Fullerton. Additionally, the bike lane should go THROUGH both intersections. See an example of a “through bike lane” in this photo. Too often bicyclists in Chicago are “dropped off” at intersections, left to fend for themselves and get caught in the same problems as automobiles. But automobiles and bicycles are different kinds of vehicles and need different treatments and direction.
  2. Roundabout – Was a roundabout considered for any of the three intersections? What were the results of this analysis? A modern, turbo roundabout should be given serious consideration for at least one of the three intersections.
  3. Curve and wide road on New Elston Avenue – On “New Elston Avenue” between Fullerton and Damen, there are two regular lanes and one bike lane in each direction. The widening of Elston was not justified. The high radius curve on New Elston Avenue on the east side of the project, and two regular lanes in each direction, will likely cause higher-speed traffic than bicyclists are used to on many roads on which they travel in great numbers. Automobile drivers speeding around the curve may enter the bike lanes. This is a good case for protected bike lanes at least on this part of the roadway.
  4. Removing the center island – Was removing the center island an alternative the project team considered?
  5. Queue backups caused by Fullerton-highway ramp intersection – The project area should be expanded to include the intersection to the west of the project area, at Fullerton/Kennedy ramp. Westbound drivers constantly and consistently block the Fullerton intersections with Damen and Elston while waiting to go through the signal at the highway ramp.

A bird’s eye view of the new configuration.

Bicycle trailer sharing

Bicycle trailers can hold hundreds of pounds of goods, food, and furniture. However, high quality and durable trailers for bikes can be expensive (about $350) for one bicycle rider, especially if they plan to only use it a few times per year. A trailer sharing program could be the answer to distributing the high cost of purchasing and maintaining the trailers for sporadic use.

My friend Josh pulls a trailer with automated bike counting equipment.

West Town Bikes and the Loaded Bikes Collective are asking for your vote in the Pepsi Refresh Project. You’ve probably heard of it by now – when Pepsi advertises something, they really advertise something. It’s on the radio, television, and on every soda can and bottle. Visit their project page for more information, a budget breakdown, and to vote. (Loaded Bikes delivers for Community Supported Agriculture, farmers markets, and city gardens.)

In 2009, I created a proposal (really a shot in the dark) for a trailer sharing program modeled after ZipCar and I-GO. Read the full proposal after the break.

Continue reading