Tag: two-flat

Two-flat owner journal 2: Demolishing the interior

In order to get the two-flat ready for a gut rehab, one has to gut it.

The rehab stage is still months away, as my architect and I continue to develop plans. He does most of the work, but it’s quite collaborative because there are layout, design, and finishing choices that we need to make.

Gutting the house is also necessary for the plans because my architect needs to know what’s behind the walls.

I hired Amplify Property Solutions for the job. APS has a social mission of training and employing young Black men. You can ask me personally how much it cost, but it was between $5,000 and $10,000 (that range includes the cost of six Dumpsters).

I am very happy with the crew’s work and Ron and Ted’s dedication to communication, clarity, and customer service. The work took a week longer than they predicted because of some aspects that I think were next to impossible to know:

  • There were 1-2 “extra” layers of flooring in some places. From top to bottom in the upstairs living room there were carpet, wood, linoleum, wood, and subfloor layers.
  • Because the center beam in the basement has been failing (sagging) for years, the centers of each floor were sinking making the floors unlevel. Platforms were built in each kitchen to raise and level the floor.
  • The house is one of two row houses, so one exterior wall is shared. On this wall, behind the drywall was a 1″ layer of plaster that took awhile to chip away.

The subfloor boards are very wide and old growth and original (so they’re at least 130 years old). I’ve been told that some people find these valuable; if you’re interested in purchasing them, please get in touch!

See more photos below and in the house photo album.

Permitting

With this level of demolition, a permit is required! I pulled an easy permit for this project (which I think cost $375). The Dumpster company obtained their own permits to occupy the street right of way.

Also, as a way for the Chicago Department of Buildings to discourage gut rehabs being permitted with a series of easy permits, when a Standard Plan Review is most likely required, the DOB required that I apply for a renovation/alteration permit and show them in-progress drawings.

Consultants and contractors used so far


First floor kitchen
The demolition exposed the shape of the chimney. The right side was filled in and the wall was flat so we didn’t know how wide the chimney was.
The kitchen platform
The kitchen platform had a level top, but the floor beneath was uneven. The framing underneath the platform had angles cut to ensure the platform was level.

Two-flat owner journal 1: Peoples Gas charges a lot of money for no gas

One of the first things I did after I bought a two-flat in July was contact Peoples Gas and Comed to ensure utilities were in my name, and that the utility connections would not be interrupted.

A few days later I decided that I wasn’t going to move in, because I wanted to make a good amount of changes and the best time to do that would be when nobody is living there. “Good amount of changes” turned into “gut rehab”. One of my friends is an architect and we (mostly him) are drawing permit plans right now.

It wasn’t until a week ago (8 weeks since I bought the house) that I realized there’s no reason to be paying for Peoples Gas to maintain a connection when I’m not using natural gas.

I’m writing this journal entry to exclaim how expensive it is to just “leave the gas line connected”.

It costs $50 per month per unit to have the privilege of possibly purchasing the delivery of natural gas through a pipe. Both units used 0 therms in the longest-period bill I received. (I received three bills, only one of which was for 30 days.)

The bill for the only 30-day period Peoples Gas served one of the units in my two-flat. Both units are unoccupied until after the gut rehab is completed. See the “customer charge”, which is the charge just to have an account open and for the potential to use gas.

I’ve got to pay $50 per unit for no gas.

I visited a three-flat under construction in Pilsen on Friday, and talked to the developer, Brent. He described how he’s following high-efficiency building wall standards to create a “tight envelope” (one in which very little air can leak) so that the tenants can “receive the comfort they’re paying for”. When it comes to setting the thermostat, the air delivered by HVAC machines should match that exactly, no more, no less. No oversized furnaces pushing too much heated air because so much of the air leaks through the walls and windows.

And, as a way to control costs, Brent will not connect a natural gas pipe to the building, mostly because of the expensive and default customer charge that persists even when no gas is used. A VRF (variable refrigerant flow) and heat pump machines will be entirely powered by electricity to serve the tenant’s heating and cooling needs.

Brent said that the tight building envelope coupled with the high-efficiency HVAC means that it’s more cost effective to use electricity to heat a house than natural gas.

After our meeting, I looked again at my final bill from Peoples Gas (I closed the account two days prior) and understood what Brent was saying about controlling costs. With an electric water heater and an electric range, there’s no need to have any gas connection.

I will probably have to keep the gas at my two-flat, to power the furnaces, because I don’t have the expertise or financial resources to renovate an existing building to have a tight enough envelope to make electrically-generated heat more cost effective than gas-generated heat.

Update January 13, 2021: I turned off the gas and closed the accounts so I don’t have to waste any money while I’m not living there (a gut rehab still needs to happen).

To keep water pipes from freezing and bursting I cleared the vast majority of water lines and added an electric pipe heating cable to keep the remaining sections warm.

The two water service pipes (I don’t know why there are two) have an electric pipe heating cable and are wrapped in foam insulation. The cable has a thermostat that touches the pipe and starts heating when the pipe drops to 38°F. The pipe is heated until the thermostat detects ~46°F.