My new favorite traffic crash impact analogy, as heard at a meeting about a road diet

At Wednesday night’s community meeting at the University of Chicago Alumni House (5555 S Woodlawn) in Hyde Park about a proposed road diet and installation of protected bike lanes on 55th Street, a resident spoke up and asked about possible negative bus and bicycle interactions in the shared space bus stops.

In the proposed street reconfiguration plan, bus stops remain at the curb. The protected bike lane is curbside as well. Where they overlap, an unprotected bike lane “occurs” around the space created for the bus stop.

He likened the interaction to this (which is paraphrased): “It doesn’t matter if a rock falls on a melon, or if a melon falls on a rock, the melon still cracks open”.

Bike racks, so contentious

A new bike rack installation in Richmond, Indiana. Congratulations!

Leslie Knope from Parks & Recreation says, “I once hosted a forum about a new bike rack that lasted 7 hours. Now when I need these people to complain, they’re done in 45 minutes”.

Recap for the June 2011 MBAC meeting

Updated June 15, 2011: Added section on snow removal for the Kinzie Street bike lane. Updated October 16, 2011, to add quotes protected bike lane planning. 

Every three months, staff from the Chicago Department of Transportation and Chicago Bicycle Program come to Room 1103 in City Hall to tell the bicycle community at large what they’re up to – it’s the Mayor’s Bicycle Advisory Council. Other organizations get an opportunity to speak as well (especially Active Transportation Alliance) but a majority of the time is dedicated to the divisions of the Bicycle Program (namely bikeways, bike parking, and education).

Wednesday’s meeting was the only one I’ve been to where I felt that CDOT was doing something new, different, and interesting. And I’ve been to many, all as an employee of CDOT – at least 10 meetings since 2007. A LOT of new information was imparted at this meeting.

Thanks to Jim Limber, you can watch the meetings live. Or watch the recordings: Part 1, Part 2.


Here’s my MBAC recap, originally written for the weekly Chainlink newsletter:

Streets for cycling and protected bike lanes

Ben Gomberg introduced Mark de Lavergne of Sam Schwartz Engineering who will be leading the new Streets for Cycling planning process that will include 3-6 public meetings across the city to talk about future locations of Chicago’s bikeway network. The plan will include a toolbox of ideas and implementations adapted from the NACTO Urban Bikeway Design Guide. The report will be completed by Bike To Work Day 2012.

The first 25 miles of protected bike lane locations has apparently already been assessed and will be done right away, without waiting for the plan to be completed. The starting place for these protected bike lanes is getting people in and out of downtown.

Bicycle Program coordinator Ben Gomberg said that the location of 25 miles had already been assessed. Deputy Commissioner Luann Hamilton said,

We’re being asked to be creative and come up with new information quickly by the new mayor, but we already did some planning before the new mayor. Our starting place: How to get in and out of downtown.

People interested in providing their ideas before the public planning process begins can send them to Mike Amsden. [email protected]

Neighborhood Bikeways Campaign

Adolfo Hernandez from Active Transportation Alliance announced the Neighborhood Bikeways Campaign, to be led by John Lankford (not present). Here’s a paraphrasing of what he said: “There will be a fight early on about bikeways. The people in this room love these things. Businesses to be supportive of this, our local alderman. This isn’t on every alderman’s radar. As cycling advocates, we need to talk to our neighbors, businesses, churches, and schools. As part of the campaign for 100 miles, we are going to meet with people to do some organizing, spreading messages, building support, before the backlash. People are going to be upset, not going to like it.”

Kinzie Street snow removal

When a meeting attendee asked how snow would be dealt with on the Kinzie Street protected bike lane, CDOT Deputy Commissioner Luann Hamilton mentioned that new CDOT Commissioner Gabe Klein built similar lanes in Washington, D.C., where it also snows, and will bring his experience in this to Chicago. 

Poor bicycling conditions on Vincennes

Anne Alt showed in a slideshow and described the reasons why Vincennes Avenue is a great bike route (even if bike lanes were removed and never reinstalled) but it has a lot of problems. She highlighted problems, especially at the train viaduct at 83rd and Parnell. Luann said that CDOT would help Anne identify the responsible railroad as a first step to getting the nearly invisible potholes under the viaduct repaired.

She posted her narratives and photos on The Chainlink.

I took a lot more notes so if you have any questions about something else that was said or wasn’t said, let me know and I’ll update it. I picked these as the most interesting and important parts of the meeting. One more thing: The Bicycle Program officially announced the on-street bike parking in Wicker Park, which I discussed a couple weeks ago.

Gin and I rode on the Kinzie Street protected bike lane together right after the meeting. Notice how wide it is! I’ve said it before: bikes are social. I’d already written over this a few times prior to the meeting, but I wanted to ride with someone else to see that experience. There’s normally not enough room in the bike lanes to ride next to someone, but here there is. I’m very excited about the opportunities this kind of facility opens up.

Friday is final day for comments about Damen-Elston-Fullerton

Tomorrow, Friday, May 13, 2011, is the final day to email comments to Bridget Stalla, project manager for the Damen-Elston-Fullerton reconfiguration.

What should you do?

  1. Read an overview of the project and my analysis
  2. View photos of the posters at April’s open house to understand what will and won’t change
  3. Think of what you like or don’t like about the project
  4. Email your comments to Bridget: [email protected]
  5. Think about posting your comments here.

My draft comments

Here’s what I plan to email Bridget tomorrow:

  1. Bike lane on Damen – There should be a bike lane on Damen connecting the two ends north and south of Fullerton. Additionally, the bike lane should go THROUGH both intersections. See an example of a “through bike lane” in this photo. Too often bicyclists in Chicago are “dropped off” at intersections, left to fend for themselves and get caught in the same problems as automobiles. But automobiles and bicycles are different kinds of vehicles and need different treatments and direction.
  2. Roundabout – Was a roundabout considered for any of the three intersections? What were the results of this analysis? A modern, turbo roundabout should be given serious consideration for at least one of the three intersections.
  3. Curve and wide road on New Elston Avenue – On “New Elston Avenue” between Fullerton and Damen, there are two regular lanes and one bike lane in each direction. The widening of Elston was not justified. The high radius curve on New Elston Avenue on the east side of the project, and two regular lanes in each direction, will likely cause higher-speed traffic than bicyclists are used to on many roads on which they travel in great numbers. Automobile drivers speeding around the curve may enter the bike lanes. This is a good case for protected bike lanes at least on this part of the roadway.
  4. Removing the center island – Was removing the center island an alternative the project team considered?
  5. Queue backups caused by Fullerton-highway ramp intersection – The project area should be expanded to include the intersection to the west of the project area, at Fullerton/Kennedy ramp. Westbound drivers constantly and consistently block the Fullerton intersections with Damen and Elston while waiting to go through the signal at the highway ramp.

A bird’s eye view of the new configuration.

That was easy: Wicker Park-Bucktown SSA approves on-street bike parking installation money

Read the discussion about this on The Chainlink.

I went to the Wicker Park-Bucktown Special Service Area (SSA) #33 commission meeting on Wednesday night. Jason Tinkey joined me. I had a lot of questions before going in about the on-street bike parking I wrote about yesterday and many were answered in the proceedings. At the end I asked my final questions. Today’s meeting was about passing a motion, which passed unanimously, to approve funding $4,000 to pay CDOT for the installation.

Here’s the story:

A Dero Downtown rack will be installed in front of the Flat Iron Arts Building in a parallel parking space that is not currently metered. The bike rack is designed to store 12 bicycles. The Dero Downtown rack looks identical to Chicago’s Plaza racks but has slightly different geometry. It has square tubing and is of high quality; it can stand alone or be anchored easily, even to asphalt – I definitely approve this rack choice.

It will be purchased by the SSA* and donated to the Chicago Department of Transportation which has agreed to assume liability. I don’t know what the installation includes, but the cost, $4,000, seems quite high! The SSA has a target installation month of June 2011. Milwaukee, Wisconsin, may have its second by the end of May.

Orange lines indicate approximate location – could be north or south of the fire hydrant. These are the non-metered parking spaces.

The Dero Downtown rack looks just like this Plaza rack, so named because of its first appearance at Daley Plaza.

Expect to see a scene like this in Wicker Park by the end of summer 2011.

*The standard price for this bike rack, in 2011, is $1,584 for powder coat or galvanized, or $1,836 for thermoplastic or black rubber dip. Delivery will cost over $500. The SSA passed a motion in March 2011 (PDF) to approve $4,000 to procure the bike rack.

Improvements in store for the Damen-Elston-Fullerton intersection

Updated May 2, 2011, with additional comments and concerns.

The City of Chicago plans to make major changes to the intersection of Damen-Elston-Fullerton. They revealed a lot of these changes and invited the public to learn more and make comments on the current proposal at an open house event Wednesday, April 27, 2011, at the Wicker Park-Bucktown library.

What is now actually three, closely-spaced intersections with six legs (two of them skewed), will become three, distantly-spaced intersections at right angles.

Why is this being done?

  • The closely-spaced intersections “encourage poor decision making.”
  • Small radii makes it difficult for trucks to make turns.
  • The island and closely-spaced intersections makes for limited queue capacity which blocks the other legs.
  • There are a lot of crashes, over 400 in a 3-year period. That’s over 7 per week.

So what’s the solution?

The Chicago and Illinois Departments of Transportation, and project consultant Benesch came up with 4 alternatives.

  • Enhanced “no build” – no improvements, but modernize signals didn’t address safety or delay. [In infrastructure project planning, there’s always a “no build” alternative to which the other alternatives are compared.]
  • Fullerton tunnel, or underpass. A majority of Fullerton traffic would bypass the intersection, but the surface intersection would still have same conditions outlined under “why.” Additionally, there are many utilities under the intersection that would all need to be relocated. It would take 3 years to build. For the length of the tunnel, surface traffic on Fullerton could only make right-in, right-out turns.
  • Overpass. A majority of Fullerton traffic would bypass the intersection, but the surface intersection would still have same dismal conditions. This has the same turn restrictions as the underpass – this and its imposing aesthetics could impact economic development (the presentation didn’t say whether the project designers expected this to be positive or negative).
  • And there’s the “preferred alternative.” It has wider sidewalks, larger turn radii, and “safer bike accommodations.” Delays would improve from up to 7 minutes to under 30 seconds.

Other benefits of the preferred alternative include:

  • Access to properties is preserved.
  • Simpler intersections means fewer conflicting movements.
  • A “new bike lane” (I disagree with calling it new – the project is preserving the existing bike lane, bringing it into the new route of Elston Avenue, or whatever the new street will be called).
  • Supports future economic development by having simpler traffic.

What’s the timeline?

  • 2011 – Finalize phase 1 engineering. Seek approval from IDOT and the Federal Highway Administration (FHWA). Start the design process.
  • 2012 – While continuing work on the design, begin acquiring right of way.
  • 2013 – Finish design, and bid out project.
  • 2014 – Award project and begin construction.

The project is estimated to cost $32 million, with funds coming from the TIF Bank, grants from the FHWA, and the City’s own capital improvement funds.

Comment on the design until May 13 by emailing Bridget Stalla, the project manager who works for the City of Chicago. All emails to her about this project will go on the public record.

So what are my comments?

Lack of bike lanes

Currently there’s no striped bike lane for .26 miles on Damen Avenue between where it ends at the I-90/I-94 highway and railroad viaducts to where it ends on the hill to the bridge over the Chicago River.

The project does not add this bike lane, which I feel is much needed for the cyclists who deal with the congestion and tight spaces. I talked to Bridget and Colin Coad, a staffer at Benesch about this. Both admitted that a bike lane in this location was considered. It wasn’t in the current design because Damen Avenue must have two lanes northbound to keep the queue capacity and keep delays down. An animation showed the difference in delays between the existing and proposed intersection configuration. The delay reduction in the new configuration was very noticeable. This doesn’t preclude installing a bike lane.

An attendee asked Ryan Thady, who was explaining the animation, if Benesch had done analysis on a single northbound travel lane south of Fullerton Avenue on Damen Avenue. He answered, “No. If there’s one lane, there’s an increased delay.”

Colin said that a bike lane has always been under consideration and will be again under consideration. Bridget says she realizes there’s a need to reevaluate the bikes on Damen Avenue situation. “We need the two lanes to really make this thing work like it’s supposed to. We will look at extending the bike lane on Damen north of Fullerton [from the bridge approach to the intersection of Damen and Elston].”

I’m confused about “making this thing work like it’s supposed to.” After hearing this, I felt that I don’t know if it’s clear to me what this thing is supposed to do. I thought it was about improving safety and reducing delays. By having a bike lane, bicyclists’ safety will be improved and their delays will also be reduced.

Some bicyclists may be involved in collisions with motor vehicles here because they move against signals. The same is probably true for drivers who get into collisions: frustration and impatience and simply not knowing when you’ll have a turn may lead road users at this intersection to proceed when it’s not safe to do so (and against the signal). The project designers said that this intersection “encourages poor decision making.” With dedicated space, in the form of a bike lane, as well as simpler design and an expectation of when it will be one’s turn to go, bicyclists and drivers alike will better comply with intersection controls.

The plan does nothing to add bike lanes through the Elston or Damen intersections. The Damen bike lane currently ends 700 feet before the intersection. The Elston bike lane ends 400 feet before the intersection. That funny business needs to stop and we need bike lanes in Chicago that go THROUGH intersections, much like you see in New York City (example photo 1 and photo 2.

Complete Streets

My final comment, a quick one, is that the project made no mention of reduced travel times for those who ride the Fullerton or Damen Avenue buses through this intersection. We still have a long ways to go in accommodating, and caring about, our sustainable transportation modes.

Bicycle crashes are also not mentioned in the documentation, while motor vehicle crashes with pedestrians are. There were more crashes with bicyclists than with pedestrians in the 3-year period of 2007-2009 (12 versus 4). Bicycle counts have not yet been taken at this location; they should be conducted as soon as possible.

Complete Streets in Illinois needs to stop being a policy without any teeth and put into regular practice. Enough with just “considering” all transportation modes; we need to “provision” them.

Roundabout

Was a roundabout considered at this location? The Pennsylvania Department of Transportation’s Guide to Roundabouts (PDF) lists criteria on where to use roundabouts, including these which describe the intersections in question:

  • Large traffic signal delays
  • Heavy left turning traffic
  • More than four legs or unusual geometry
  • History of crashes involving crossing traffic
  • Traffic growth expected to be high and future traffic patterns uncertain or changeable [because Elston is a diagonal and near shopping, traffic volume will not change]
  • History of right angle crashes [this is true because of the confusing signal phases]

While three roundabouts may not be necessary, one should be considered at least for the Elston-Fullerton intersection, which has the most space available for such a facility.

Curve and wide road of New Elston Avenue

On “New Elston Avenue,” between Fullerton and Damen, there are two regular lanes and one bike lane in each direction. The widening of Elston was not justified. The high radius curve on New Elston Avenue on the east side of the project, and two regular lanes in each direction, will likely cause higher-speed traffic than bicyclists are used to on many roads on which they travel in great numbers. Automobile drivers speeding around the curve may enter the bike lanes. This is a good case for protected bike lanes at least on this part of the roadway. Thank you to A. Lottes for pointing out the curve to me.

Removing the  center island

Some commenters on The Expired Meter have suggested removing the tinny center island (as well as removing the second stop bar and signal every road user passes over) and converting it to a simple six-way intersection like Lincoln-Ashland-Belmont. While doing so may reduce delays or the number of crashes, it would probably fail to do both. I think it should be a considered alternative.

Queue backups caused by Fullerton-highway ramp intersection

The plan does not address the westbound queue backups that start at the Fullerton intersection with the I-90/I-94 highway ramp. Westbound drivers constantly and consistently block the Fullerton intersections with Damen and Elston while waiting to go through the signal at the highway ramp. This intersection is outside the project area but pivotal in its success at reducing delays, at least with the “remaining,” new intersection at Damen.

More information

The end of the presentation said that all exhibit materials would be on the City’s website, but I didn’t find all the poster boards, so here are most of them in my Flickr photoset. I assume they would be posted here.

Photos

A visualization of the crash history (only automobiles and pedestrian types included) at the intersection.

Bird’s eye view of preferred alternative.

© 2017 Steven Can Plan

Theme by Anders NorénUp ↑