I don’t feel like explaining the ups and downs of the last six months, which is when my building permit application was resubmitted. I’ll commemorate the occasion by sharing these photos of the new footings that have been excavated.

A new steel beam – actually three segments – will be installed in the basement, supported by two new posts on these two new footings. The orange lines in the footing holes represent the top of the future floor slab, indicating a 18″ dig-down.

The holes cannot be filled in until a city building inspector comes by. After they are filled in, and a post is installed, more excavation will occur on the perimeter to do underpinning. This will extend the depth of the house’s foundation to support it for another one hundred years, and probably prevent more sinking and shifting.