Author: Steven Vance

Philadelphia Water Department moves away from Deep Tunnel-style water management

West North points out that instead of spending $8 billion to build new sewage holding tanks throughout the city, the Philadelphia Water Department plans to conver impervious surfaces to pervious, natural surfaces. The American Society of Landscape Architects has more information on The Dirt:

The green infrastructure proposal would turn 1/3 of the city’s impervious asphalt surface, or 4,000 acres, into absorptive green spaces. The goal is to move from grey to green infrastructure. Grey infrastructure includes “man-made single purpose systems.” Green infrastructure is defined as “man-made structures that mimic natural systems.” As an example, networks of man-made wetlands, restored flood plains, or infiltration basins would all qualify as green infrastructure. The benefits of such systems include: evaporation, transpiration, enhanced water quality, reduced erosion / sedimentation, and restoration. Some grey / green infrastructure feature integrated systems that create hybrid detention ponds or holding tanks, which are designed to slow water’s release into stormwater management systems.

And, like Portland, Philadelphia is accomplishing more than just better stormwater management.

…the city is calling for a triple-bottom line approach, aiming for: more green spaces, improved public health, and more green jobs. [The Dirt]

Portland is building “Green Streets” that combine bicycle facilities with green infrastructure like bioswales inside curb extensions. This plan did not arise perhaps as altruistically as Philly’s (actually with a little controversy), but more as a way to build bicycle facilities with bioswale funding.

Meanwhile, the Deep Tunnel system in Chicago continues to expand. But it’s not all bad. The City of Chicago will showcase green infrastructure in a new streetscape in the Pilsen neighborhood.

Where to start with off-bus fare collection

Right here, at Madison and LaSalle.

After reading this article on Human Transit about off-bus fare collection in Paris*, I thought, “Where in my city can we implement that system?”

I count 61 waiting passengers in this photo. If the routes that picked up here had off-bus fare collection, all 61 passengers would have paid for their upcoming ride and would be able to board at all doors. Instead of idling for 4 minutes, the bus would leave in 2.

“Proof of payment,” as off-board fare collection is commonly known, is typical in light rail systems around the world, including in North America, but not so much on buses.

Is there a stop or route in your town where off-bus fare collection would speed boarding and improve travel times? Do you see any disadvantages to collecting payment before passengers board?

Four routes stop here and use high-capacity buses (they’re articulated). All use LaSalle Street until its end and then continue on to different north side neighborhoods.

Tribune points out why we need something better than Deep Tunnel

60 billion gallons of rain fell on Cook County on Friday night, according to the Metropolitan Water Reclamation District’s (MWRD) president Terrence O’Brien.

Water Reclamation

The world’s largest wastewater treatment plant just north of Navy Pier in downtown Chicago. One of two plants in the city limits. Photo by kendoman26.

That’s enough to fill 1.2 billion of these Suncast rain barrels*. The rain was too much for the Deep Tunnel – the underground network of  water reservoirs. They hold water runoff during storms before it goes to the water treatment plant for cleaning, after which it will flow into one of the water channels in and around Chicago. But the storms on Friday were too much – the MWRD had to release sewage into Lake Michigan because the reservoirs were full.

This in turn forced the Chicago Park District to close the beaches.

“All 109 miles of the Deep Tunnel system were filled during the storm, O’Brien said.”

We find ourselves in a situation similar to that of traffic congestion. Building new and wider roads doesn’t relieve traffic congestion. The same might be true for Deep Tunnel construction. Longer and wider tubes won’t reduce our water usage or how much stormwater is directed to the sewers (Chicago has a combined sewer, draining sewage from buildings and stormwater from the street). The Chicago Tribune article doesn’t exactly point out the solution, and it only hints at the problem: We get more water in our tunnel than we can handle.

Chicago Harbor Lock

The Chicago Harbor Lock separates the Chicago River from Lake Michigan was opened to allow the river to discharge its overflow into the lake. The water at Chicago’s magnificent beaches could have been contaminated so the Park District closed swimming at ALL beaches until at least Monday morning. Photo by Norma Fernandez.

Chicagoland needs a better stormwater management plan that incorporates sustainable best practices. We can start by encouraging landscaping that absorbs stormwater instead of acting like a slope towards the nearest drain. New streetscape projects can have bioswale planters. What other ideas are there to reduce the amount of runoff that has to be stored in hundreds of underground tunnels?

*The MWRD sells rain barrels to the public online for pickup. Rain barrels are just one part of a multi-pronged solution to stormwater management.

Chicagoland transit projects

UPDATE: A Tribune story from today about suburban transit is sizzling: “A majority of Chicago-area residents think improving bus and train service is so important to the region that repairing and expanding expressways and toll roads should take a back seat…” Continue reading.

I listed several transit projects happening or about to happen (17 of ’em) in the Chicago city limits, but Ted Villaire writes in the Active Transportation Alliance’s current newsletter about some suburban transit projects underway.

The station in downtown Geneva, Illinois, will see longer platforms and better delineation of waiting areas and crossing paths. Additionally, the operating railroad (Union Pacific), Metra, and the City of Geneva are working to expand the parking options – it’s about time that Geneva works on a bike plan. There are thousands of residents with a couple miles of the station and the station is near two major multi-use trails.

  • Skoke – New Yellow Line CTA station at Oakton Street.
  • Winnetka – Refurbished Metra UP-North station.
  • West suburbs – Track and station upgrades at many UP-West cities.

The UP-West line will receive an exciting, new and visible safety upgrade: Another Train Warning System. This product serves to alert those travelers who seem to distrust the accuracy of warning bells and gates by explicitly announcing the presence of an incoming train. The device visually and audibly alerts passengers of the existence of another train in the platform and station area.

All Metra enhancements should be done by 2011.