Category: Cities

Tuesday roundup: Getting around

These are the posts about “getting around” I found interesting today. Blogs and the links to the referenced articles are in bold.

“Nowhere does transportation happen for transportation’s sake.” – Professor DiJohn, UIC.

Discovering Urbanism

Have you ever noticed from an elevated train or an airplane the dirt paths and small trails through parks and vacant lots? Like water and electricity, people travel the path of least resistance, with or without a dedicated facility. (Is that why flooding’s so difficult to control?) In the most recent “Google Earth Travelogue,” Discovering Urbanism points out the innumerable walking paths in the quarter mile park or mall between two highways and building corridors in Brasilia, the master planned capital of Brasil. Selected quotes:

I added this comment about how planners can use this “route choice theory” (path of least resistance) to determine where to install paths for bicyclists: “Where should cities build bikeways? Where people want them. And how might we figure where people go, aside from a stated answer survey, we could tag 1,000 random bicyclists with GPS and track where they go. It would probably give us an image like the second one in your post: with yellow lines criss-crossing the city’s street network.”

Jennifer Dill’s study of Portland, Oregon, bicyclists did just that! She asked, “How does the built environment influence bicycling behavior; and what routes did they take?” The project wasn’t used to determine where routes should be built, but how existing routes affect trips. I think the same data the project collected could also be used to answer my question, “Where should cities build bikeways?”

Human Transit

The City of Minneapolis, Minnesota, is in the midst of a major transportation upgrade in downtown. They’re converting one-way streets to two way streets with bike lanes and off-peak parking. What a way to “unlock downtown,” says Human Transit.

And they tripled bus capacity on new transit malls with two regular travel lanes in one direction, and two bus-only lanes in the opposite direction. The malls also mixing in staggered bus stops, or groups of stops targeted at a specific area of the city, making “service more legible.” Selected quotes:

  • “…every bus was as slow as the slowest bus.”
  • “Doubling the width triples the capacity.”

I visited Minneapolis in September to explore the Midtown Greenway and Hiawatha light rail. I also rode my rental bike through downtown to get a feel for how another Midwestern city’s downtown lives.

The Transport Politic

Dubai seems to grab way more headlines than its Persian Gulf neighbor, Qatar. But Qatar, with the fastest growing economy on Earth, has decided rail (both passenger and freight) infrastructure is a “crucial element to economic viability.” Some might say the Dubai Metro heavy rail transit line is too late to battle congestion (Reuters). Can Qatar avoid the same fate?

The plan the Qatari government signed with Germany’s Deutsche Bahn is ambitious: “The project will incorporate 180 miles of local light and metro rail for Doha city center, rapidly expanding public transportation offerings for what is now a car-centric place.” Selected quotes:

  • “Deutsche Bahn is laying its reputation — and its money — on the line for this project, which will be its largest-ever foreign investment.”
  • “If a country is defined by the spending it commits to its future, the U.S. is falling behind rapidly.”

I don’t think the United States will start comparing itself it to any Middle Eastern country anytime soon – many in this country still think Iraq was involved in the September 11, 2001, terrorist attacks.

Placemaking roundup

A roundup of recent posts on the blogosphere about attempts at placemaking. While engineers, planners, designers, and architects can spend time and money on making a place, only its users have the authority to call it one. How will these “places” fare?

  • Disney will be revamping its stores to match the Apple Stores’ level of attraction and attention by no longer placing the attention on toys, but more on experience and interaction. “Imagination Park” from Brand Avenue.
  • A team led by MIT researchers entered a competition to build a new, permanent, tourist attraction to be built for and after the 2012 Olympics in London. Visitors would ascend one of two 400-foot towers and watch the city from inside plastic bubbles, while on the face of the bubbles, a “mood barometer” would be projected. Read deeper into the project’s beginnings and the people behind “The Cloud” on City of Sound.
  • Two new parks (or plazas?) open in downtown Chicago, Illinois, and both feature boxed up lawns. This new “park” phenomenon helps Lynn Becker refine the definition of a park.
  • Council on Tall Buildings and Urban Habitat changes “tall buildings” standards to now include lowest pedestrian entrance. The result: Trump Tower now taller than Jin Mao Building in Shanghai, China. Burj Dubai still world’s tallest: “John Hancock Center stacked atop Sears Tower.”

Photo of typeset as seating in Printers’ Row Park in Chicago, Illinois. See item three below.

World photographic tour

Grab your laptop and fall comfortably into your first class couch or easy chair and load up my first world photographic tour.

Flickr is a goldmine of the best photos on earth. Find photos of anything and everything. Learn about far off and not so far off places. With World Tour #1, learn about new transportation developments in Dubai, flashy architecture in England and Spain, and stacked infrastructure in Japan. But our tour won’t be all ritz and glamor. See moveable bridges in Chicago and protected bike lanes in New York City.

See all 15 photos in my World Tour #1 gallery on Flickr, or start the tour below.

Let’s begin!

Spaceship architecture from starchitect Santiago Calatrava. The first building at City of Arts and Sciences, a planetarium, was constructed in 1998. Location: Valencia, Spain. Photo by: Guidotoni58.

Motorists can’t turn at this intersection. Probably to reduce traffic congestion and to accommodate pedestrians. Also notice the enormous stores from luxury goods brands Giorgio Armani and Louis Vuitton. Location: Hong Kong (SAR China). Photo by: PSeangsong.

New train line and rolling stock intended for 2012 Olympics use. 29 trains with 6 cars each. Travels between St. Pancras and Ebbsfleet stations. (I don’t understand the divisions of England and greater London; I decided it would be easier to list the terminals instead of cities or villages.) Location: Greater London, England. Photo by: Fugu ツ.

See 12 more photos and descriptions in my World Tour #1 gallery on Flickr. My favorite photo is the final one, showing an elevated intersection just for pedestrians (similar to what you might see in Las Vegas, Nevada, or any Asian city with a few million residents).

Comparing the Portland and Seattle bike plans

The assignment:  Find two plans written on a common theme from cities with similar attributes and compare them. The purpose is to start reading plan documents produced by firms, agencies, and organizations around the country. Furthermore, the comparison should include a critique of each plan. For this assignment, I compared the bike “master” plans for Seattle and Portland. The cities have a similar population, and are geographically close.

The class: Making Plans, Making Plans Studio. This class has a lecture and a lab. The assignments are due in the lecture session, which have little to do with the single assignment for the lab. In the lab, students write an actual plan. I took this class in Spring 2009 and each of the four labs independently write an economic development plan for Blue Island, Illinois.

Portland and Seattle are very closely located cities and have a population difference of only 20,000. Portland is recognized as the bicycling capital of the country, but Seattle desperately wants to compete. I reviewed each of their bicycle master plans, but Portland’s is in need of an update. Seattle released their bicycle plan in 2007.

Organization and Design

Portland is definitely known around the country and world as the United States’ premier bicycling city. The leading hobby magazine, Bicycling, identified Portland as such back in 1995 (according to their Bicycle Master Plan). As such, I was expecting their plan to be near perfect. I found that its organization was haphazard and difficult to follow.

Portland installed its first bike boxes in 2008 in response to deaths caused by right-turning trucks.

For example, the plan is 159 pages long but does not use paragraph or section identifiers (i.e. Objective 1.2) or page headers or footers that can tell the reader where they are in relation to the other sections of the plan. The only understandable section identifiers are in the table of contents and the objectives labels. The objectives labels are taken straight from Portland’s comprehensive plan and all come from the same section of that plan (section 6). Eventually you may find that the Portland bicycle plan does have a chapter for each subsection of section 6 in the city’s comprehensive plan. Unfortunately the label is written once at the beginning of the section and is blurred into a black and white photo.

The Seattle plan smartly follows the Chicago example of heavy sectioning and sub-sectioning. This method makes it easy to reference, locate and describe an exact strategy in the plan. In this way, each strategy, or action item as Portland calls them, has a distinct identifier. By following the Chicago example, plans can also more easily internally cross-reference. The one cross-reference in the Portland plan tells me to find Section IV B3. Section IV is only labeled at the beginning of that section, so a reader first has to find that page. Then within Section IV, “B3” is nowhere to be found. There’s no way to infer what B3 could mean. It could mean “benchmark” but Section IV has no benchmarks for the strategies described. Cross-referencing in the Seattle plan is helpful: the links usually take the form of, “For more information, see Chapter 4.” Sometimes the Seattle tells visitors to go online.

Both the Seattle and Portland bicycle plans have great initiatives to improve bicycling, but Seattle’s document surely makes their future work much easier to find!

Bicyclists are the first customers off the ferries in Seattle. On an average day, over 50,000 trips are taken by ferry.

Content

Both the Seattle and Portland bicycle plans provides a lot of extraneous but relevant information, including tips on safe cycling, traffic laws, maps, facility design guides, and crash data. This makes for a long plan but provides governmental and transit agencies the information they need to make decisions available in a central place. The plan document can also act as a self-promotional tool: information contained within the plan is identical to the information that the plan makers want to educate people. For example, within the Portland plan, safe cycling guidelines are included. The necessity of its inclusion in the plan document is debatable, but it doesn’t distract from the plan’s reason for existence.

Portland also includes in its plan a streets and bikeways design guide. This is a separate document that explains to traffic engineers and roadway constructors and planners how to design and build streets, including signage, that make it safer for bicyclists to ride upon.

Both plans have very similar strategies, but because of Seattle’s more recently developed plan, it includes recently accepted innovative traffic calming techniques as well as new bikeway designs (like bicycle-only left turn lanes).

The Portland plan’s age might become a disadvantage to the city and its bicyclists if uninformed agencies are strictly following its guidelines. The Portland Bureau of Transportation, in which sits the Bicycle Program, has fortunately not stuck to strategies listed. PBOT has installed several bikeways and bike parking facilities that are not mentioned in the plan, namely colored bike boxes between pedestrian crosswalks and motorist stop bars, as well as on street bike parking.

UPDATE: Portland closed on November 8, 2009, the public comment period for the 2009 Bike Master Plan Update. Read the draft plan.

Increasing the City of Chicago’s tree canopy

The assignment: You are on a team working with the City of Chicago on increasing the City’s tree canopy from just under 15% to 25%. What would you recommend? Please bear in mind that most city staff feel that they have covered most city owned land and that to reach the goal they will have to get private landowners to plant the trees. How can we get them to do this? What types of parcels present opportunities?

The class: Sustainable Development Techniques

How the class works: The professors invite working professionals to speak to the class each week. After the lecture from these guests, a short discussion ensues. The guests design the homework questions. The following week, the class discusses their responses with each other and the professors.

I’ve identified four parcel types that present opportunities to increase the City of Chicago’s tree canopy from 15% to 25%.

1. Existing surface parking lots, both private and public
2. New surface and multi-level parking lots, both private and public
3. Schools, both public and private
4. Condemn private lots

1. The team will inventory private and public surface parking lots. Using demand survey data, the team will identify specific lots and direct them to reduce the number of spaces by half the difference between demand and availability. The team will select the spaces where trees will be planted at no cost to the parking lot owner. Alternatively, the parking lot owners can choose to purchase and install secure, sheltered bicycle parking on the spaces where trees would have been planted. Owners must install this facility at their own expense but may charge for its use.

The owners choose between a no cost option that potentially reduces their income, or a cost option that potentially reduces their income. Both options would potentially reduce carbon or carbon emissions associated with the parking lot.
2. The team will recommend zoning code changes that reduce the number of required auto parking spaces for new parking lots, increase the number of bicycle parking spaces, and improve the zoning code’s accommodations to alternative fuel, hybrid and shared car spaces. The code will require that builders plant trees in the space that would have been built as auto parking. The code will specify best tree planting practices so the builders plant trees in places on the parcel where it will live.

Parking lots will become useful to a larger number of users, and reduce carbon in the atmosphere.

3. Many schools have land paved with asphalt, acting either as a playground or parking lot for staff. Under a district (or diocese) and City-wide plan to reduce carbon emissions and improve the health of staff, schools will install sheltered bicycle parking on a small portion of the asphalt, and then remove a large area of asphalt. They’ll replace the removed asphalt with grass and trees. Principals will make up the first group of staff to adopt alternative commute methods (which can include carpool, vanpool, transit, walking or bicycling), starting with at least two days per week.

Students will receive a kid-friendlier playground. School staff will reduce their carbon emissions. Schools will help reduce their contribution to the urban heat island effect. New trees will reduce carbon in the atmosphere.

4. Lastly, the City will condemn private lots and convert these to urban forests. The team will first identify residential areas, and then commercial areas. Communities identified by the team to receive urban forests can choose to have and operate a farm or garden instead. The City will provide relocation assistance to all residents of a blighted or energy inefficient building who decide to move to a denser part of the city. The City would then condemn the lot and building, aggregating it into the forest. A variation of this plan includes strategic placement of the trees: The trees can be planted in such a way on the parcel’s perimeter that would permit a new parcel owner to build a new, energy efficient home on the lot.

I feel unclear about the consequences of this strategy. Will the new urban forests raise, lower, or leave alone property values? Will property owners appreciate a rise in property values? Will they feel their neighborhood has improved? How will the forests affect crime and other neighborhood activities?