Category: Urban Planning

Quotes about transportation equity

My master’s project involves a discussion about equity. Equity of bike parking distribution is the main focus of my project.

I picked up some great books at my school’s library. Here are some selected quotes (many of which I’ll use in the project’s paper).

  • “Transportation improvements distribute nonuniformly over space, implying that they affect diverse populations disproportionately” (Berechman).
  • “Geography defines the contours of the equity analysis in two important ways. First, since investment in transportation infrastructure is geographically specific, there is inherent competition and conflict between places” (Hodge).
  • The “costs and benefits of transportation policies may take place in different time periods” (Bae and Mayeres). For example, “mega projects are often built with excess capacity aimed at satisfying future needs. Such a pattern imposes inequitable intergenerational transfers, favoring the future rather than the present generations” (Berechman).
  • “Indirect benefits…represent real impacts that probably benefit some people more than others. It is exceedingly difficult, however, to trace through the benefit stream of these broad impacts” (Hodge).

And my favorite: “Transportation is an unusual public service in that it is not consumed for its own sake but, rather, as a means to another end. Thus, the value of the service depends primarily on how well it provides access to other places” (Hodge).

My professor last semester said the same thing, actually, and then we had a huge discussion trying figure out situations where this isn’t true. The only thing our class (well, the professor himself) could come up with was joyriding (driving aimlessly in a car). But is joyriding really transportation? The trip origin and destination are the same and the trip has no purpose.

I thought of the transportation system at Walt Disney World, but I eventually withdrew my support – although the goal of that system is to make it easy for guests to spend more money, the system has a legitimate role in giving access to places inside and outside the “pay area.”

Sources

Bae, Chang-Hee Christine and Inge Mayeres. “Transportation and Equity.” Donaghy, Kieran P, Stefan Poppelreuter and George Rudinger. Social Dimensions of Sustainable Transport: Transatlantic Perspectives. Burlington: Ashgate Publishing Company, 2005. 164-192.

Berechman, Joseph. The Evaluation of Transportation Investment Projects. New York City: Routledge, 2009.

Hodge, David C. “My Fair Share: Equity Issues In Urban Transportation.” The Geography of Urban Transportation. Ed. Susan Hanson. Second. New York City: Guilford Press, 1995.

Benefits of bike parking

I’m working on my master’s project about bike parking distribution and equity in Chicago and while working on a section in the paper, I decided to get some help from readers. Many transportation projects are measured on predicted changes like trip travel time savings or trip cost savings (I give two examples below the photo).

My question is this: What are a bike parking installation’s measurable benefits to a traveler or a community?

Photo: Portland has installed 40 on-street bike parking “corrals” since 2004. What does a traveler or community gain from this bike rack installation? Photo by Kyle Gradinger.

To figure equity (fairness) for these project types, you measure these impacts for different groups (often high, medium, and low income), either in the alternatives analysis, or project selection phases. So, converting a lane on a highway to charge tolls for the lane’s users will have a certain benefit for many trips: a lower trip time. A new bus route may be convenient enough for some travelers to switch from driving to taking the bus, possibly reducing their trip cost.

Simple & successful bike parking

Not every concept, skill or tool can be further and further simplified. Does anything really take just 3 steps?

  1. Set it
  2. Forget it
  3. No third step! (This article is about bike parking, not Ron Popeil’s Showtime Rotisserie!)

I believe I can simplify bike parking. Here are my two rules to have successful and well-used bike parking:

1. Put bike parking as close to the front door as physically possible. I can’t tell you how many times I’ve seen bicycle riders use a substandard sign pole or tree instead of a high-quality bike rack because the bike rack was an additional 20 feet from the front door.

UPDATE: As Dave Reid points out in the comments below, close parking increases security. Additionally, I’ve now written about the phenomenon where people lock to inadequate fixtures when high-quality bike parking is nearby, what I call “Bike Parking Phenomenon A” or the “50 feet rule.” Every foot makes a difference!

Kuma's Corner
The bike parking in this photo sits only 20 feet away from the front door to a popular Chicago, Illinois, restaurant called Kuma’s Corner.
Bike parking phenomenon A (50 Feet Rule)

The bike parking in this photo is too far away from the Whole Foods store entrance for bicyclists to consider using it.

2. Choose the right bike rack. How do you know? Give bicycle riders a bike rack that’s easy to use and secure (i.e. don’t let the bike rack be the weak point in the bicycle’s security).

The U-rack (also known as inverted U-rack, staple rack, and Sheffield stand) is the best design out there. Some variations, like the one at the top of the post, are acceptable. Square tubing is preferred because it cannot be cut by a $5 pipe cutter.

Kuma's Corner

Six u-racks (also known as inverted-u, or staple racks) line the sidewalk in front of Kuma’s Corner in Chicago, Illinois.

If these two tips aren’t good enough, read through the online brochure, Bicycles at Rest, from the Capital Bike & Walk Society, in Victoria, British Columbia, Canada.

Rep. Mica of Florida is confused about how best to support high-speed rail

From Associated Press writer Joan Lowy’s article, “White House doles out $8 billion for fast trains,”

Rep. John Mica of Florida, the senior Republican on the House transportation committee, complained that the Midwest lines awarded grants will achieve top speeds of only 110 mph and were “selected more for political reasons than for high-speed service.”

No, John, the Midwest was selected because it had a comprehensive plan with a regional approach, and with all Midwest states on board a collaborative effort to make Chicago the hub of an expansive network of fast trains that go to many, desirable destinations.

The Midwest was also selected because many of the Amtrak routes showed increased ridership over the past three years (2006-2009), and the ones that received a higher state subsidy or targeted improvements (with funding from the states) that reduced travel time and increased reliability showed an especially high increase in ridership.

And excuse me, Florida received a lot of money for a high-speed train between Tampa, Orlando, and Miami.

View more of my articles on this expanding topic.

High-speed rail stimulus awards coverage and summary

President Barack Obama was in Tampa, Florida, Thursday morning to announce the winners of the high-speed intercity passenger rail funding from the American Reinvestment and Recovery Act (ARRA). The best coverage of this topic is on The Transport Politic.

View a spreadsheet summarizing all of the high-speed rail corridors, their award amount, and investment projects. I prepared this document based on the press releases from the White House Press Office. With these press releases, I also created the construction summary below.

The Acela, a train traveling from Washington, D.C., to Boston via Baltimore, Philadelphia, and New York, is the country’s only high-speed rail, achieving a top speed of 150 miles per hour for only a few minutes. Photo by Jonathan Rissmeyer.

Construction Summary

Construction will occur in the following corridors*:

  • Northeast
    • New track and signals on the New York – Albany – Buffalo corridor.
    • New track on the New York – Montreal corridor.
    • Track will be restored/repaired on the Boston – Portland – Brunswick corridor.
    • A station will be built in Greenfield, MA, a station restored in Northampton, MA, and 11 new miles of track in CT, on the New Haven – Springfield – Burlington – St. Albans corridor.
  • Midwest
    • Two stations will be renovated in Troy and Battle Creek, MI, and a new station built in downtown Dearborn, MI, on the Pontiac-Detroit-Chicago corridor.
    • Also on the Pontiac-Detroit-Chicago corridor, a flyover, approach bridges, embankment and retaining walls will be built in Indiana.
    • Construction in Illinois on the Pontiac – Detroit – Chicago corridor includes the relocation, reconfiguration, and addition of high-speed crossovers and related signal system improvements, rail line additions at two locations, and the creation of a new passing tracks.
    • In Iowa, find four, new, remotely controlled powered crossovers on the BNSF Ottumwa subdivision.
    • Cities in Ohio will see various construction projects on the Cleveland – Columbus – Dayton – Cincinnati corridor, including new stations and upgraded track.
    • Illinois becomes the center of attention again on the Chicago – Milwaukee corridor, with various track and station improvements.
    • New stations will be built along the Milwaukee – Madison corridor, which will also see various track upgrades.
    • Illinois is the center of the Midwest rail network. The third largest award in this grant program goes to the Chicago – St. Louis corridor, for upgraded track, signals, and stations, installation of positive train control, and some CREATE projects to reduce congestion in and outside of Chicago.**
    • The St. Louis – Kansas City corridor will see upgraded bridges, crossovers, and improved grade crossings.
  • Pacific Northwest
    • On the Seattle – Portland corridor, expect construction of a bypass track, grade separations, the addition of Positive Train Control, and seismic retrofits to King Station in Seattle, WA.
    • The Portland Union Station will be upgraded.
  • South and Southeast
    • Between Fort Worth and Austin, new signals at grade crossings will be installed.
    • The Charlotte – Raleigh corridor will receive track upgrades.
    • Four new crossovers will be constructed in the Raleigh – Richmond corridor.
    • Between Richmond – Washington, D.C., trains will travel over 11 new miles of high-speed track
  • California
    • The California High Speed Rail Authority receives the largest chunk to construct track, signals, and stations.
    • On the Pacific Surfliner Corridor (San Luis Obispo – Los Angeles – San Diego), new track and crossovers will be constructed.

View on Google Docs or download an Excel file.

*This construction summary is about as complete as the press releases from the White House. I reviewed each press release and copied the information that indicated where construction or upgrades of new or existing project components would actually occur. I excluded planning, environmental impact statements, engineering, and design components of the above projects. I compiled the most important information from the White House press releases into a spreadsheet.

**UPDATED: For more CREATE and Englewood Flyover information, which was funded at $133 million, see page 2 of the Federal Railroad Administration’s summary handout (PDF) and this discussion on Railroad.net.