Tag: high speed rail

I voted – I hope you did, too

Photo by Eric Pancer.

I’m locking my bike at the elementary school to a bench. A guy on the other side of “the line” (marked by blue cones) asks me if he can give me a sample ballot.

“No, thanks, got my own!”

I used the Chicago Tribune’s “ballot maker” website to print a list of the people I wanted to vote for. That included these three Metropolitan Water Reclamation District candidates. I also voted for other candidates who have shown their support for things I want, like high-speed rail (a currently occurring reality in Illinois) and public transit. I voted for people like Pat Quinn and Dan Lipinski to further support these efforts to make Illinois more economically competitive as well as develop more sustainably and most important of all, get people where they’re going on environmentally-friendly transportation modes.

Why did you vote? What message did you send?

Chicago and Illinois construction updates, October 2010 edition

This post will be updated as I receive more information and shoot more photos. Please contribute your own updates and news.

  • High-speed rail in Illinois – Yes, America is building some “high-speed” rail (for the second time). The first leg of track replacement is from Springfield to Alton (across the Mississippi River from St. Louis). I am really interested in renting a car and driving down here to see it for myself.
  • 31st Street harbor/marina – Originally introduced on my blog in July and again in August. The Chicago Park District is developing a full marina, including a boat ramp and restaurant.
  • Sustainable streetscape in Pilsen – A water feature and bioswale was recently installed at Benito Juarez Community Academy on Cermak Road. I’ve been told it’s especially fantastic during the rain, as the water is collected from the roof, pours down a spout into a small creek.
  • 35th Street Metra station – Originally introduced on my blog in July. The line will help my roommate get to his old neighborhood faster. Oh, it will improve access to the White Sox stadium, hopefully helping to reduce idling and congestion on the Dan Ryan expressway and our neighborhood roads that get backed up during baseball games.

31st Street Beach and harbor construction.

Do you have construction updates for your city or state?

High-speed rail under construction in Illinois

UPDATE: The City of Carlinville Facebook page provides consistent and timely updates on the railroad crossing closures while the Union Pacific track is upgraded. The City posted photos, too.

If you weren’t specifically seeking out information on high-speed rail (HSR) construction, and you weren’t searching for “track renewal train” and other obscure keywords, you wouldn’t actually know about the status of HSR.

But that’s why you follow my blog – I’ll keep you updated.

Right now, crews are working 10 hour days, working 10 days on, and 5 days off* in Carlinville, Plainview (photo), and Alton, Illinois, to remove existing track and wooden ties and replacing them with concrete ties and continuously welded rail (CWR).

The proof is in the videos, taken only four days ago in Carlinville (map) on October 1, 2010. Watch more videos from PSQLead.

The Harsco Track Technologies Track Renewal Train 909 (TRT-909) does the following:

  • Picks up and carries out of the way old rail
  • Removes old wooden ties with a robot arm
  • Digs up ballast
  • Places new concrete ties
  • Drops in new rail and heats it so it can be “continuously welded”
  • Clamps new rail to new ties

What the beast looks like from afar. Photo of Union Pacific’s TRT-909 in Aldine, Texas, by Matthew Holman.

Thankfully Illinois doesn’t have a growing anti-rail political force like Ohio, California, Florida, or Wisconsin. All of these states have Republican candidates running for governor who say they will stop the train in its tracks. Read more about this unfortunate situation in The New York Times.

*This information comes from a secondary source. I hope to get in touch with someone who knows more about the work.

Departing under the best conditions

I was reading a brochure and timetable (yes, we still call them that) about the TGV Lyria high-speed train service from Paris to cities in Switzerland. Someone left it on a counter at work. It’s in French, and I can read about half of it.

The timetable asked that travelers board the train at least two minutes before the departure, “pour assurer les départs TGV Lyria dans les meilleures conditions” (to ensure the train departs in the best conditions).

Two minutes? You only have to find your train 2 minutes before departure time?

Short story: Back in 1998 (I was 14), my mom and I were traveling from Paris to London on the Eurostar (travels under the English Channel). We’re walking down the ramp to the platform and one of the conductors sees us coming. He yells or motions for us to hurry up. We start jogging down the ramp and jump into the nearest car door.

About 45 seconds later, the train leaves.

A Eurostar train at Gard du Nord. Photo by Marcel Marchon.

More about being on-time:

  • 87.8% of TGV Lyria trains were arrived on time in June 2010.
  • 76.% of flights from 24 reporting airlines arrived on time in the same month. (U.S. DOT)

Posts I liked today

It’s been like two weeks since I last posted. That’s because my master’s project is due in 25 days. I have to finish it.

I still read the news while I’m busy, though!

  • Infrastructurist: How to Make High Speed Rail Fail: Don’t Connect the Lines. Apparently, no one’s taking the lead in Florida to ensure the high-speed rail line (Tampa to Orlando, which received $1.25 billion) will connect with the not-yet constructed SunRail commuter/regional rail line around Orlando.
  • BikePortland: Editorial: When it comes to family biking, size matters. Families use bikeways and streets differently than individual riders and even other grouped riders. How can we plan bicycle-related street upgrades to better accommodate family cycling?
  • Wall Street Journal: Surface Improvements. The New York City Department of Transportation did a great thing when it reallocated street space on Broadway to improve conditions for pedestrians, tourists, residents, and bicyclists. The eight month experiment is now permanent and the City is holding a competition to replace the semi-temporary facilities (epoxy gravel, discount store seating) with more permanent furniture.

Photo: Families in Portland, Oregon, ride together to a nearby event on a recent weekend. Photo by Jonathan Maus.