What if Metra employees were late to work as often as Metra passengers?

trainmageddon

A malfunctioning Metra Electric train in January. Photo by Eric Rogers.

It was a big deal to news media this morning when new Metra CEO Don Orseno reported at an Illinois House mass transit committee hearing that the commuter-focused rail system experienced a 30% on-time rating in January, when the “polar vortex” hit. (Apparently polar vortex is not an event that happens to a place, but is the name of a climate pattern that’s always there hovering above Canada and occasionally dips down over the United States.)

Most Metra passengers are commuters, going to work. A hair over 300,000 travel each weekday; service is drastically lowered on weekends and holidays, offering less than half the service of weekdays.

What if the organization of Metra, including all 2,500 employees in addition to the contracted railroad workers (let’s say 3,000 people), showed up to work with the same performance rating that their passengers experience?

First, Orseno – a career railroader who drives to work from Manhattan where a train comes leaves three times each day – would miss 11 work days of work each year (of 260 work days), based on their overall 95.8% on-time rating in 2012. Some routes are worse and others better. But collectively 3,000 people would miss 32,760 work days each year. That’s a lot of missed work.

Put another way, everybody – all 3,000 of them – is going to show up 20.16 minutes late to work because they’re missing 87.36 hours each year (of 2,080 hours they’re supposed to work and being 4.2% hours late). But again, I have no idea who’s working 8 hours and who’s working longer. (One of the problems Metra had during #Chiberia is that many workers hit the federally mandated limit and there weren’t always workers to take their place.)

Thankfully the Chicago Transit Authority, Pace, and ever-expanding highways and tollways are available to pick up the slack in Chicagoland’s transportation supply.

Another thing, this post is full of averages of averages, so it’s really imprecise. Today, Metra was reporting delays on a single train run of 16-100 minutes – a pretty broad estimate, but another train had a possible delay of 26-110 minutes. During the worst storm Metra experienced on January 5th and 6th, some train runs dumped passengers on platforms in subzero temperature.

Orseno reported today at the committee hearing that a “I don’t want to say middle-level” manager at Union Pacific made the call to dump the passengers. This has been “corrected” by only allowing a senior level staffer at Union Pacific make this call. Metra, which doesn’t have any performance-related incentives in its contracts with the freight railroads, apparently cannot stop this decision.

I’m waiting for the day when Metra is run like a transit system and not a railroad.

Note: I excluded vacation days because, well, no law requires organizations to offer paid or unpaid vacation days and there are probably several tiers of vacation-giving at Metra that I don’t know about.

Departing under the best conditions

I was reading a brochure and timetable (yes, we still call them that) about the TGV Lyria high-speed train service from Paris to cities in Switzerland. Someone left it on a counter at work. It’s in French, and I can read about half of it.

The timetable asked that travelers board the train at least two minutes before the departure, “pour assurer les départs TGV Lyria dans les meilleures conditions” (to ensure the train departs in the best conditions).

Two minutes? You only have to find your train 2 minutes before departure time?

Short story: Back in 1998 (I was 14), my mom and I were traveling from Paris to London on the Eurostar (travels under the English Channel). We’re walking down the ramp to the platform and one of the conductors sees us coming. He yells or motions for us to hurry up. We start jogging down the ramp and jump into the nearest car door.

About 45 seconds later, the train leaves.

A Eurostar train at Gard du Nord. Photo by Marcel Marchon.

More about being on-time:

  • 87.8% of TGV Lyria trains were arrived on time in June 2010.
  • 76.% of flights from 24 reporting airlines arrived on time in the same month. (U.S. DOT)

Why Amtrak’s not on time

“Over the last 12 months, Amtrak operations and equipment contributed between 11 and 18 percent of the total delay.  Likewise, “third party” causes of delay, such as inclement weather and police activity, contributed only between 6 and 8 percent of the total.  The delay that Amtrak ascribes to the “host” railroad, on the other hand, averaged 79 percent of total monthly delay.”*

Amtrak operates some commuter trains in California.

Breaking down delays attributable to the host railroads (across the national system):*

  • Freight train interference (25 percent)
  • Passenger train interference (this really means other Amtrak trains)
  • Commuter train interference
  • Slow orders not related to weather (“likely in response to track conditions”)
  • Signal delays

And the reason Amtrak can’t report: Continued underfunding at a time when ridership is increasing. Congress makes yearly allocations to Amtrak and without an expectation for stable long-term funding, the National Passenger Railroad Corporation can’t make long-term investment plans or seek alternate, additional funding (like bonds). Recently received American Recovery and Reinvestment Act funding gives Amtrak a necessary booster shot to clear out a backlog of maintenance. But this doesn’t solve the year-to-year fight for dollars.

An Amtrak train emerging from Chicago Union Station (CUS).

State of Illinois-supported routes (from Chicago to St. Louis, Missouri, and Milwaukee, Wisconsin) show a 20% increase since 2007. The Illinois Department of Transportation has spent millions of dollars in the past few years to upgrade track, crossings, and signals to improve travel times. You can see the effect on ridership when you improve service. I think this makes Illinois a strong contender for high-speed rail stimulus money not yet awarded.

*Delay information comes from the Chicago Metropolitan Agency for Planning’s 2009 Freight Snapshot draft report.