Category: Transportation

High-speed rail under construction in Illinois

UPDATE: The City of Carlinville Facebook page provides consistent and timely updates on the railroad crossing closures while the Union Pacific track is upgraded. The City posted photos, too.

If you weren’t specifically seeking out information on high-speed rail (HSR) construction, and you weren’t searching for “track renewal train” and other obscure keywords, you wouldn’t actually know about the status of HSR.

But that’s why you follow my blog – I’ll keep you updated.

Right now, crews are working 10 hour days, working 10 days on, and 5 days off* in Carlinville, Plainview (photo), and Alton, Illinois, to remove existing track and wooden ties and replacing them with concrete ties and continuously welded rail (CWR).

The proof is in the videos, taken only four days ago in Carlinville (map) on October 1, 2010. Watch more videos from PSQLead.

The Harsco Track Technologies Track Renewal Train 909 (TRT-909) does the following:

  • Picks up and carries out of the way old rail
  • Removes old wooden ties with a robot arm
  • Digs up ballast
  • Places new concrete ties
  • Drops in new rail and heats it so it can be “continuously welded”
  • Clamps new rail to new ties

What the beast looks like from afar. Photo of Union Pacific’s TRT-909 in Aldine, Texas, by Matthew Holman.

Thankfully Illinois doesn’t have a growing anti-rail political force like Ohio, California, Florida, or Wisconsin. All of these states have Republican candidates running for governor who say they will stop the train in its tracks. Read more about this unfortunate situation in The New York Times.

*This information comes from a secondary source. I hope to get in touch with someone who knows more about the work.

New blogs I like

Now that I’m without a job, I’ll have more time for reading, commenting, and writing. And job finding. I just started reading these two blogs today and they’re quite exciting. Both blogs started this year.

  • MAX FAQS – MAX means Metropolitan Area Express, the name for Portland, Oregon’s regional light rail system. I’m not sure who writes it (that’s left out on the introduction post), but they’ve very knowledgeable about the operations of TriMet and light rail in general.

Two trains at the Rose Quarter Transit Center, northwest of the busy and multi-modal Steel Bridge in Portland, Oregon.

Sustainability is more than individuals installing rain barrels to water their lawn (for free). But we all should so less water goes down the drain and into costly water treatment plants.

Trying out new GIS software

I want to draw 50 and 120 feet buffers around the points of store entrances to show where bike parking should and shouldn’t be installed. I want to follow this example:

walgreens with bike parking buffers

Aerial photo of a Tucson, Arizona, Walgreens showing the location of existing bike parking and two buffers (50 and 120 feet) where proposed city rules would allow bike parking. I advocate for ratifying the 50 feet rule, which I’ve discussed on this blog and elsewhere many times.

I want to do this easily and accurately, so I will use GIS software to create a “buffer.” I use QGIS occasionally, but I want to try out other Mac-friendly applications. I’m getting my orthoimagery (geometrically corrected aerial photography) from the United States Geological Survey (USGS) using a web protocol called Web Map Server. I’m trying:

  • Cartographica, $495, with free trial license.
  • uDig, completely free software. UPDATE: I have had NO success getting any data to load from a WMS connection into uDig. I would like to understand why. Cartographica can obtain some of the WMS-stored data I want, although it messes up often.

I’m having success with neither – both are having issues downloading or maintaining a connection to the USGS orthoimagery. In one case, Cartographica trims the Bing Maps imagery to match the extent of my other objects (the buffer). In another case, it won’t even download the USGS imagery (and gives no indication that anything is happening). uDig hasn’t been able to download anything so far – I hope it’s asking for the current extent, instead of all data because it’s taking a looong time to do anything (so long that I just quit in the  middle of it).

This screenshot shows how to add new WMS connections to Cartographica.

UPDATE: I did it! I successfully used Cartographica (and the integrated Bing Maps) to create this drawing that shows the current (abysmal) bike parking at a Chicago Home Depot outside the 50 feet line.

Bike parking distance being put to test in Tucson

Work is underway to implement strict (but appropriate) rules about where Tucson, Arizona, businesses must install bike racks. This news comes from Tucson Vélo. It first came to my attention in May when I was creating and expanding my definition of Bike Parking Phenomenon A, which I now call the “50 feet rule.”

3 of4 bikes are parked on hand rails within 20 feet of this Seattle Whole Foods entrance while one bike is parked more than 50 feet away at the City-owned bike rack.

I left this comment on yesterday’s article from Tucson Vélo:

“Distance is more key to bike parking usage than the quality of bike parking fixture. Bicyclists prefer to use an easily removable sign pole that is closer to final destination than lock to a permanent bike rack further away.”

Some businesses there are complaining that devoting room in front of their business to bike parking removes space available for selling goods. I encourage everyone to support rules requiring bike parking within 50 feet. If installed further away, it simply will go unused.

I’ve written about distance parking many times:

After new bike racks were installed within 10 feet of the Logan Square Chicago Transit Authority entrance, no one parks at the original spots. See how the foot makes a difference?

Departing under the best conditions

I was reading a brochure and timetable (yes, we still call them that) about the TGV Lyria high-speed train service from Paris to cities in Switzerland. Someone left it on a counter at work. It’s in French, and I can read about half of it.

The timetable asked that travelers board the train at least two minutes before the departure, “pour assurer les départs TGV Lyria dans les meilleures conditions” (to ensure the train departs in the best conditions).

Two minutes? You only have to find your train 2 minutes before departure time?

Short story: Back in 1998 (I was 14), my mom and I were traveling from Paris to London on the Eurostar (travels under the English Channel). We’re walking down the ramp to the platform and one of the conductors sees us coming. He yells or motions for us to hurry up. We start jogging down the ramp and jump into the nearest car door.

About 45 seconds later, the train leaves.

A Eurostar train at Gard du Nord. Photo by Marcel Marchon.

More about being on-time:

  • 87.8% of TGV Lyria trains were arrived on time in June 2010.
  • 76.% of flights from 24 reporting airlines arrived on time in the same month. (U.S. DOT)