Page 133 of 170

Metra 35th St. station surely won’t win any design awards

UPDATE 04-07-11: The station opened on April 3, 2011. Blair Kamin explains why it doesn’t look as good as originally designed:

It didn’t have to be this way. The Chicago office of Skidmore, Owings & Merrill came up with a promising design for the station, one that justified the demolition of a Mies-designed brick hut that reportedly served as the entrance to an underground testing facility for explosives during the Cold War.

But then, things went seriously off the rails.

This new Metra commuter/regional rail station at 35th Street and Wentworth/Federal won’t win any design awards. Neither will the Lovana S. “Lou” Jones/Bronzeville Station stand out for having such a generic design.

The station under construction as of October 3, 2010.

Artist’s renderings of the station and street-level plaza, looking northwest. Left photo from Metra’s website and right photo from Singh & Associates’s website.

The amount of visible concrete used in the stairs and ramps construction (one complete set on either side of the tracks) is fitting if you consider the station’s surroundings: a 12-lane highway (the Dan Ryan, I90/94), thousands of surface auto parking spaces to the west (for the White Sox stadium), and an empty lot.

But what if we looked for design inspiration from the east?

Imagine a station shelter modeled after the sound mitigation “tube” over the Illinois Institute of Technology McCormick-Tribune Campus Center a few blocks away at State Street designed by Rem Koolhaas.

Photos above taken by Steven Crane.

Throw in some curves like the Canary Wharf stations on the Jubilee and Docklands Light Railway lines.

Photo of the Canary Wharf Docklands Light Railway (DLR) station by stephenk1977.

Photo of the Canary Wharf Jubilee Underground Line station by Payton Chung.

Companies involved:

Open letter to Blair Kamin about Safeway and Dominick’s

Blair Kamin, the Chicago Tribune’s architecture critic wrote about the new LEED-certified Dominick’s* (Safeway) grocery store in Lincoln Square at Lincoln and Berwyn. This store features copious bike parking of a decent quality and design (see photo below).

In February 2009, I wrote a letter to the General Manager at their 3145 S Ashland store (read my letter). Someone at the company promptly made a request to the City of Chicago in March 2009 for a bike rack. The request was denied because the store is too far away from the nearest public right-of-way.

The following is my letter to Blair Kamin, John Hilkevitch (Tribune transportation writer), and the CEO of Safeway, Steve Burd.

Dear Blair,

I would like your help in getting better accommodations for bike riders at a local Dominick’s.

I read your article about the new, LEED-certified Dominick’s in Lincoln Square with copious bike parking available. (This should help with the potential auto parking issues you identified by encouraging people to bike to the store.)

The Dominick’s nearest me, at 3145 S Ashland, underwent major renovation in 2008 and 2009. People who ride their bicycles to the store (myself included) locked them to the shopping cart guard rails that were removed during renovation.

Bike parking was not included in this renovation.

LEED certification shouldn’t be the only impetus for installing bike parking. Currently it only gains the development 1 point and more than 40 are needed (more for Bronze, Gold, Silver, or Platinum). Installing bike parking should be an economic decision.

A single bike rack (holding two bikes) will cost less than $300 and require no maintenance for at least 5 years (some bike racks installed by the City are over 10 years old and look/work fine). A car parking space costs $1,000 per year to maintain.

We currently lock to garbage bins in a sheltered area near the store entrance. I ask that Dominick’s install real bike parking here in 2010. If they do, I’ll then ask them to work on the bike parking situations at their other stores (like the store at 1340 S Canal).

Thank you for your attention to bicycle infrastructure matters in Chicago.

Steven Vance
http://www.stevevance.net

P.S. The Dominick’s at 3145 S Ashland also has the unfortunate situation of being in a strip mall far away from any public roads. This precludes the City from installing bike racks; the nearest public space is more than 50 feet away.

Jewel…you’re up next!

The bike parking area at the new Dominick’s grocery store in Lincoln Square. Sure beats locking to a garbage bin at the Dominick’s at 3145 S Ashland in Bridgeport. That store underwent renovation in 2008 and 2009.

What bike parking at 3145 S Ashland looks like.

*The store is not yet LEED certified. Blair reports it’s expected to receive a Silver rating.

Chicago and Illinois construction updates, October 2010 edition

This post will be updated as I receive more information and shoot more photos. Please contribute your own updates and news.

  • High-speed rail in Illinois – Yes, America is building some “high-speed” rail (for the second time). The first leg of track replacement is from Springfield to Alton (across the Mississippi River from St. Louis). I am really interested in renting a car and driving down here to see it for myself.
  • 31st Street harbor/marina – Originally introduced on my blog in July and again in August. The Chicago Park District is developing a full marina, including a boat ramp and restaurant.
  • Sustainable streetscape in Pilsen – A water feature and bioswale was recently installed at Benito Juarez Community Academy on Cermak Road. I’ve been told it’s especially fantastic during the rain, as the water is collected from the roof, pours down a spout into a small creek.
  • 35th Street Metra station – Originally introduced on my blog in July. The line will help my roommate get to his old neighborhood faster. Oh, it will improve access to the White Sox stadium, hopefully helping to reduce idling and congestion on the Dan Ryan expressway and our neighborhood roads that get backed up during baseball games.

31st Street Beach and harbor construction.

Do you have construction updates for your city or state?

High-speed rail under construction in Illinois

UPDATE: The City of Carlinville Facebook page provides consistent and timely updates on the railroad crossing closures while the Union Pacific track is upgraded. The City posted photos, too.

If you weren’t specifically seeking out information on high-speed rail (HSR) construction, and you weren’t searching for “track renewal train” and other obscure keywords, you wouldn’t actually know about the status of HSR.

But that’s why you follow my blog – I’ll keep you updated.

Right now, crews are working 10 hour days, working 10 days on, and 5 days off* in Carlinville, Plainview (photo), and Alton, Illinois, to remove existing track and wooden ties and replacing them with concrete ties and continuously welded rail (CWR).

The proof is in the videos, taken only four days ago in Carlinville (map) on October 1, 2010. Watch more videos from PSQLead.

The Harsco Track Technologies Track Renewal Train 909 (TRT-909) does the following:

  • Picks up and carries out of the way old rail
  • Removes old wooden ties with a robot arm
  • Digs up ballast
  • Places new concrete ties
  • Drops in new rail and heats it so it can be “continuously welded”
  • Clamps new rail to new ties

What the beast looks like from afar. Photo of Union Pacific’s TRT-909 in Aldine, Texas, by Matthew Holman.

Thankfully Illinois doesn’t have a growing anti-rail political force like Ohio, California, Florida, or Wisconsin. All of these states have Republican candidates running for governor who say they will stop the train in its tracks. Read more about this unfortunate situation in The New York Times.

*This information comes from a secondary source. I hope to get in touch with someone who knows more about the work.

Proposed changes to 31st Street Harbor

Copied directly from the 31st Street Harbor Traffic Impact Analysis (PDF), prepared for the Chicago Public Building Commission by AECOM.

See Exhibit B on page 12 for a drawing and list of proposed changes. They’re exciting. When designing for the lakefront, the stakes are pretty high.

The only mention of “bike” or “bicycle” is misnaming the Lakefront Trail as the “Chicago Lakefront Bike Path.” Can’t anyone get this right? According to the LEED Strategy document, though, the project aims to get 1 point for a “bicycle storage/changing room.”

Stay on top of construction updates with this blog.

The 31st Street Harbor project is one of two new harbors being designed for the Chicago Park District along Chicago’s lakeshore. Located in the Bronzeville neighborhood on Chicago’s south side, the 31st Street Harbor will incorporate extensive new community amenities and a new 950 slip marina. These include over two new acres of green space located on a peninsula of land formed by a 1,200 foot long breakwater sheltering the new harbor, providing exceptional views of the Chicago skyline to the north. The breakwater will also create new underwater habitat and provide opportunities for fishing.

Photo shows the new breakwater and pier under construction. See Exhibit B.

The existing surface parking will be removed and relocated within a new parking structure covered by an accessible green roof that allows park users improved views of the lake while reducing impervious surface. Landscape plantings will include native plants selected to provide food and cover for the twice yearly bird migrations through the City, while also reducing maintenance and irrigation demands. A new fully accessible play area that connects the green roof area to the beach will replace an older existing playground, while improvements to pedestrian and vehicular circulation will improve connections to the neighborhoods in Bronzeville to the west. Located atop the green roof will be a new LEED Certified community center and restaurant, providing sorely needed facilities currently missing along the south lakeshore.

The marina itself will include approximately 950 new slips ranging from 35’ to 80’ in length, on site covered storage in the parking structure, fuel dock, marina store, dedicated shower facilities, and a public access boat ramp. Additionally, youth sailing programs and storage for small craft including kayaks will be provided, allowing this facility to make boating economically accessible to a very large portion of the community.

Breakwater and pier construction panorama at the beach in August 2010.

As part of these improvements, additional parking accommodations in addition to the new parking structure are being planned. Approximately 200 new parking spaces will be incorporated along the Fort Dearborn access road north of 31st Street, serving 31st Street beach. A new surface lot west of Lake Shore Drive and immediately south of 31st Street will be constructed with a capacity of over 150 spaces.

The existing attractions of Burnham Park near 31st Street will remain, including 31st Street Beach, the beach house, and the Burnham Skate Park.

Parking options:

  • 31st Street Harbor Parking Garage (310 covered spaces)
  • Surface Lot on Fort Dearborn north of 31st Street (202 spaces)
  • Surface Lot off Moe Drive south of 31st Street (161 spaces)
  • Total: 573 spaces

[Currently this beach has 188 auto parking spaces, a difference of 355% compared to the proposed quantity. It currently has about 14 bike parking spaces and needs more but I cannot find evidence that this number will increase when the new harbor opens.]