Copied directly from the 31st Street Harbor Traffic Impact Analysis (PDF), prepared for the Chicago Public Building Commission by AECOM.

See Exhibit B on page 12 for a drawing and list of proposed changes. They’re exciting. When designing for the lakefront, the stakes are pretty high.

The only mention of “bike” or “bicycle” is misnaming the Lakefront Trail as the “Chicago Lakefront Bike Path.” Can’t anyone get this right? According to the LEED Strategy document, though, the project aims to get 1 point for a “bicycle storage/changing room.”

Stay on top of construction updates with this blog.

The 31st Street Harbor project is one of two new harbors being designed for the Chicago Park District along Chicago’s lakeshore. Located in the Bronzeville neighborhood on Chicago’s south side, the 31st Street Harbor will incorporate extensive new community amenities and a new 950 slip marina. These include over two new acres of green space located on a peninsula of land formed by a 1,200 foot long breakwater sheltering the new harbor, providing exceptional views of the Chicago skyline to the north. The breakwater will also create new underwater habitat and provide opportunities for fishing.

Photo shows the new breakwater and pier under construction. See Exhibit B.

The existing surface parking will be removed and relocated within a new parking structure covered by an accessible green roof that allows park users improved views of the lake while reducing impervious surface. Landscape plantings will include native plants selected to provide food and cover for the twice yearly bird migrations through the City, while also reducing maintenance and irrigation demands. A new fully accessible play area that connects the green roof area to the beach will replace an older existing playground, while improvements to pedestrian and vehicular circulation will improve connections to the neighborhoods in Bronzeville to the west. Located atop the green roof will be a new LEED Certified community center and restaurant, providing sorely needed facilities currently missing along the south lakeshore.

The marina itself will include approximately 950 new slips ranging from 35’ to 80’ in length, on site covered storage in the parking structure, fuel dock, marina store, dedicated shower facilities, and a public access boat ramp. Additionally, youth sailing programs and storage for small craft including kayaks will be provided, allowing this facility to make boating economically accessible to a very large portion of the community.

Breakwater and pier construction panorama at the beach in August 2010.

As part of these improvements, additional parking accommodations in addition to the new parking structure are being planned. Approximately 200 new parking spaces will be incorporated along the Fort Dearborn access road north of 31st Street, serving 31st Street beach. A new surface lot west of Lake Shore Drive and immediately south of 31st Street will be constructed with a capacity of over 150 spaces.

The existing attractions of Burnham Park near 31st Street will remain, including 31st Street Beach, the beach house, and the Burnham Skate Park.

Parking options:

  • 31st Street Harbor Parking Garage (310 covered spaces)
  • Surface Lot on Fort Dearborn north of 31st Street (202 spaces)
  • Surface Lot off Moe Drive south of 31st Street (161 spaces)
  • Total: 573 spaces

[Currently this beach has 188 auto parking spaces, a difference of 355% compared to the proposed quantity. It currently has about 14 bike parking spaces and needs more but I cannot find evidence that this number will increase when the new harbor opens.]