Tag: Barack Obama

Reminder about open data and Obama’s Open Government Directive

Quickly after taking office, President Obama issued a memorandum about open government and opening government data. Then came the Open Government Directive* which said:

To the extent practicable and subject to valid restrictions, agencies should publish information online in an open format that can be retrieved, downloaded, indexed, and searched by commonly used web search applications. An open format is one that is platform independent, machine readable, and made available to the public without restrictions that would impede the re-use of that information.

Essentially, the executive government (er, Obama Administration) adopts the presumption of openness, that distributing public data is the default position and action to take.

Don’t squat on the data. Don’t fret over how people will view or manipulate the data – this is not your concern. Don’t delay its release. If you do this, you are a frigid dataist and I will remember this.

Photo of visual note taking at an open data seminar by Karen Quinn.

*The Directive has a little more backbone than the original memorandum: “This memorandum requires executive departments and agencies to take the following steps toward the goal of creating a more open government.”

Thank you to Tech President.

High-speed rail wrap-up

So let’s recap the week of high-speed rail announcements.

On Wednesday (1/27), President Obama in his State of the Union speech talks about how $8 billion in funding for high-speed intercity passenger rail (HSR) will be a major jobs creator.

Photo: Tri-Rail is a commuter rail service between Miami, Fort Lauderdale, and Palm Beach. In five years, a high-speed train will whisk travelers between Tampa and Orlando. The hope is that a second link between Orlando and Miami will come afterwards.

The next day, in Tampa, Florida, he announced the winners of the $8 billion dollars of funding. Actually, the White House Press Office “leaked” the press releases the night before.

So what did I do for “high-speed rail week”?

I wrote a few articles and created a couple summaries:

If you want to read some more opinions about this part of the American Reinvestment and Recovery Act (or stimulus), check out these articles I’ve selected:

Rep. Mica of Florida is confused about how best to support high-speed rail

From Associated Press writer Joan Lowy’s article, “White House doles out $8 billion for fast trains,”

Rep. John Mica of Florida, the senior Republican on the House transportation committee, complained that the Midwest lines awarded grants will achieve top speeds of only 110 mph and were “selected more for political reasons than for high-speed service.”

No, John, the Midwest was selected because it had a comprehensive plan with a regional approach, and with all Midwest states on board a collaborative effort to make Chicago the hub of an expansive network of fast trains that go to many, desirable destinations.

The Midwest was also selected because many of the Amtrak routes showed increased ridership over the past three years (2006-2009), and the ones that received a higher state subsidy or targeted improvements (with funding from the states) that reduced travel time and increased reliability showed an especially high increase in ridership.

And excuse me, Florida received a lot of money for a high-speed train between Tampa, Orlando, and Miami.

View more of my articles on this expanding topic.

High-speed rail stimulus awards coverage and summary

President Barack Obama was in Tampa, Florida, Thursday morning to announce the winners of the high-speed intercity passenger rail funding from the American Reinvestment and Recovery Act (ARRA). The best coverage of this topic is on The Transport Politic.

View a spreadsheet summarizing all of the high-speed rail corridors, their award amount, and investment projects. I prepared this document based on the press releases from the White House Press Office. With these press releases, I also created the construction summary below.

The Acela, a train traveling from Washington, D.C., to Boston via Baltimore, Philadelphia, and New York, is the country’s only high-speed rail, achieving a top speed of 150 miles per hour for only a few minutes. Photo by Jonathan Rissmeyer.

Construction Summary

Construction will occur in the following corridors*:

  • Northeast
    • New track and signals on the New York – Albany – Buffalo corridor.
    • New track on the New York – Montreal corridor.
    • Track will be restored/repaired on the Boston – Portland – Brunswick corridor.
    • A station will be built in Greenfield, MA, a station restored in Northampton, MA, and 11 new miles of track in CT, on the New Haven – Springfield – Burlington – St. Albans corridor.
  • Midwest
    • Two stations will be renovated in Troy and Battle Creek, MI, and a new station built in downtown Dearborn, MI, on the Pontiac-Detroit-Chicago corridor.
    • Also on the Pontiac-Detroit-Chicago corridor, a flyover, approach bridges, embankment and retaining walls will be built in Indiana.
    • Construction in Illinois on the Pontiac – Detroit – Chicago corridor includes the relocation, reconfiguration, and addition of high-speed crossovers and related signal system improvements, rail line additions at two locations, and the creation of a new passing tracks.
    • In Iowa, find four, new, remotely controlled powered crossovers on the BNSF Ottumwa subdivision.
    • Cities in Ohio will see various construction projects on the Cleveland – Columbus – Dayton – Cincinnati corridor, including new stations and upgraded track.
    • Illinois becomes the center of attention again on the Chicago – Milwaukee corridor, with various track and station improvements.
    • New stations will be built along the Milwaukee – Madison corridor, which will also see various track upgrades.
    • Illinois is the center of the Midwest rail network. The third largest award in this grant program goes to the Chicago – St. Louis corridor, for upgraded track, signals, and stations, installation of positive train control, and some CREATE projects to reduce congestion in and outside of Chicago.**
    • The St. Louis – Kansas City corridor will see upgraded bridges, crossovers, and improved grade crossings.
  • Pacific Northwest
    • On the Seattle – Portland corridor, expect construction of a bypass track, grade separations, the addition of Positive Train Control, and seismic retrofits to King Station in Seattle, WA.
    • The Portland Union Station will be upgraded.
  • South and Southeast
    • Between Fort Worth and Austin, new signals at grade crossings will be installed.
    • The Charlotte – Raleigh corridor will receive track upgrades.
    • Four new crossovers will be constructed in the Raleigh – Richmond corridor.
    • Between Richmond – Washington, D.C., trains will travel over 11 new miles of high-speed track
  • California
    • The California High Speed Rail Authority receives the largest chunk to construct track, signals, and stations.
    • On the Pacific Surfliner Corridor (San Luis Obispo – Los Angeles – San Diego), new track and crossovers will be constructed.

View on Google Docs or download an Excel file.

*This construction summary is about as complete as the press releases from the White House. I reviewed each press release and copied the information that indicated where construction or upgrades of new or existing project components would actually occur. I excluded planning, environmental impact statements, engineering, and design components of the above projects. I compiled the most important information from the White House press releases into a spreadsheet.

**UPDATED: For more CREATE and Englewood Flyover information, which was funded at $133 million, see page 2 of the Federal Railroad Administration’s summary handout (PDF) and this discussion on Railroad.net.

Thursday is a big day for high-speed rail in America

UPDATE 2: The Transport Politic has the most detailed and comprehensive information on high-speed rail project/corridor funding, a better looking map than Ray LaHood’s map on LaHood’s blog. The White House Press Office posted separate press releases for each project here.

UPDATE: Chicago Business (Crain’s) says Illinois to get $1.2 billion for high-speed rail projects, including money to build the Englewood Flyover connection (Project P1, see map), a major CREATE component (read more: PDF). CREATE is a multi-agency program to reduce the bottlenecks caused by mixing passenger and freight trains and at-grade road crossings.

Tomorrow, President Barack Obama and Vice President Joe Biden will travel to Tampa, Florida, to announce the thirteen corridors winning a portion of $8 billion in funding for high-speed passenger rail projects.

Infrastructurist predicts four winners.

An Amtrak train heads south from Chicago Union Station. If Illinois receives stimulus funding for high-speed rail, we may see some faster locomotives and some new track emerging from the Chicago South Loop train yards.

Vice President Biden, President Obama, and Department of Transportation Secretary Ray LaHood (from Peoria, Illinois), announced the high-speed passenger rail plan for the United States in Washington, D.C., in April 2009. Photo by Scott Bernstein of the Center for Neighborhood Technology in Chicago, Illinois.

One of the winners Infrastructurist predicts is the State of Illinois on behalf of a project to upgrade the tracks and rolling stock for the Amtrak lines Lincoln Service and Texas Eagle that run from Chicago to St. Louis. This is by far the state’s most prosperous route. The Illinois DOT has increased the subsidy to this route, increasing the frequency of service. In response, ridership has grown year over year over year (although the gain from 2008 to 2009 was only 6 percent).

Will Americans soon travel with more convenience in the coming decade?