Two huge American railroads, Union Pacific and Norfolk Southern, want to merge, which would have huge impacts on hundreds of cities across the country. The two railroads, combined, would be the largest by a wide margin and federal law requires that the Surface Transportation Board approve the merger.

Tucked into the City of Chicago’s 64-page comments on the proposed Union Pacific–Norfolk Southern merger is a situation that caught my eye. Among its requested conditions for the STB, the City asks that UP conclude negotiations to sell the Weber Spur to the city and “enter into negotiations with the City for the City’s acquisition of UP’s Low Line and Global 1 Yard.”

Excerpt from page 16 of the City of Chicago's merger comments, Requested Condition #9, asking that Union Pacific sell the Weber Spur to the City for a 2-mile trail and negotiate the sale of its Low Line and Global 1 Yard.

Global 1

Global 1 is the former intermodal terminal (where shipping containers moved between trains and trucks) at 1425 S Western Ave, which covers 123 acres. UP moved that work to Global 2 in suburban Northlake in 2023.

Map of Union Pacific's Global I intermodal yard on Chicago's Near West Side, on a light gray street grid with streets labeled. The yard is shaded teal with a solid outline: a wide block at its west end, starting at Western Avenue between about 14th and 16th streets, that narrows to a long strip running east past Ashland and Racine to near Morgan Street, just short of Halsted. Dotted gray lines show freight railroad tracks running through the yard and alongside it, with a dense bundle curving southwest past Western Avenue. The Metra BNSF line, in blue, runs along the yard's south edge through the Western Ave. and Halsted St. stations. The CTA Pink Line, in pink, runs south through the yard at about Paulina Street to its 18th station, then turns west toward Damen. Small green parks are scattered across the neighborhood. A legend in the lower left lists railroads, the CTA Pink Line, the Metra BNSF line, the yard (123 acres) and transit stations. A box in the lower right holds the title and the data sources: OpenStreetMap, the Federal Railroad Administration, the CTA and Metra.

There could be a number of uses, including breaking it up into smaller parcels for businesses that need a lot of outdoor land. You could also put a bus garage there. It would be a tragedy if it was used for distribution warehouses.

If the White Sox’s future owner buys the 14th Street rail yard from Amtrak for a stadium, Metra might also need somewhere new for its trains, and Global 1 is close by. The proposed O’Hare Flyer has also said it’s counting on freed-up land at the yard for trains to layover.

The Low Line

The Low Line is UP track near the former Blommer Chocolate factory on Kinzie Street in River West. The City’s North Branch Framework proposes a north-south transitway running from the downtown train stations up the North Branch to north of North Avenue, and a railroad right-of-way the City owns could become part of it.

It’s also a natural spot for the north portal of a CrossTowner tunnel, where trains coming from the south would climb out of the Clinton–Roosevelt Connector and continue north. You can see what that ride might look like in my virtual cab ride video.

That’s a lot of potential suitors for two rail properties. Whether the STB folds the City’s request into its decision is something to watch as the merger review continues. Replies to the comments are due February 16, 2027.

The Weber Spur

The headline request is the former Weber Spur in Northwest Chicago. The city asks the STB to require UP to “conclude negotiations” for the city to buy it, and says it proposes “an approximately 2-mile long multi-use trail in the former railroad right-of-way.” Streetsblog Chicago published an update about this project last month.

The city frames the purchase as a community benefit “at no cost to Applicants”. This reminds me of when the railroad that owned the Bloomingdale Line was happy to transfer the embankment to the city, to build the 606, as soon as possible – the property was a liability to the railroad but a benefit for the city.

Read Ryan Richter’s thread about what went into the comments that the city and partners submitted to the STB.

Here are the next steps, per STB:

  • Nov 27, 2026: Comments due on whether competing railroads’ applications are complete.
  • Dec 1, 2026: Replies to those comments are due.
  • Dec 3, 2026: The U.S. Department of Justice and USDOT file preliminary comments.
  • Dec 4, 2026: UP must answer the STB’s questions about alleged retaliation against opponents.
  • Feb 16, 2027: UP and NS respond to all comments and requests for conditions.
  • Mar 29, 2027: Competing railroads file rebuttals.
  • Spring 2027 (date TBD): The STB holds a public hearing.
  • May 28, 2027: Final briefs are due, and the record closes after that.
  • About Aug–Sept 2027: The STB aims to decide within 90 days, if the environmental review is finished.